The Great Laxey Mine was a silver, lead ore and zinc mine located in Laxey, in the parish of Lonan, Isle of Man. The mine reached a depth in excess of and consisted primarily of three shafts; the Welsh Shaft, the 's Shaft and the Engine Shaft each of these shafts being connected by a series of levels.

History

Origins

The Isle of Man contains a large variety of minerals. Copper ore was mined at Bradda Head as far back as the 13th Century, Harald, King of Mann, having granted a charter under which the monks of Furness Abbey obtained working rights of this mine.
Later in the same century the Earl of Buchan received a licence from King Edward I to dig for lead on the Calf of Man, and when the Isle of Man was granted to Sir John Stanley by King Henry IV in 1406, "mines of lead and iron" were included.
In 1700 almost 230 tons of copper ore was shipped from the Dhyrnane Mine at Maughold whilst also at this time the Rushen and Kirk Arbory mines were producing significant quantities of copper ore.
There is no exact date regarding the commencement of mining at Laxey. However, by 1782 workings were being opened, with the undertaking chiefly as an enterprise from Cumberland as opposed to the Isle of Man.
of the Great Laxey Mine

Operation

19th century

Laxey was primarily mined for its lead ore. However, in addition the mine yielded zinc, silver ore, copper pyrites and hematite iron in significant quantities.
In 1819 both Laxey and Foxdale mines were closed, but within four years both reopened. Laxey owed its fresh start to a Westmoreland man who was in turn licensed for the undertaking by George Murray, 6th Duke of Atholl. Both mines soon began to boom, with a result that a search for metals began in every part of the Isle of Man, however the results of this were practically zero.
By 1833 over 200 men were employed in the mine. Whilst various minerals were extracted from the mine, lead ore was the main component of the workings and commodities regarded to be of lesser value were simply thrown away.
The mine was rich in silver ore yielding 180 ounces to the ton. This saw a dramatic increase in the price of shares traded in the mine company, shares trading for £34 per share in the late 1820s were trading for between £1,500 and £2,000 by 1833. During the latter part of 1833 the mine sustained significant damage as a consequence of the river overflowing its banks and flooding the shaft and it was not until the end of February 1834, when the mine was once again operational.
In part payment for their services the miners obtained the right from the owners to keep the copper ore which had been extracted, and this by the mid part of the 19th Century was being sold for £23 14s 6d per ton. A mixture of copper and lead was sold for £7 per ton, and this would be used to glaze lower end earthenware.
Laxey Wheel
During the height of prosperity of the Great Laxey Mine, the Laxey Wheel was erected. The wheel was named the Lady Isabella, after the wife of Sir Charles Hope, who at the time was the Lieutenant Governor of the Isle of Man. During its working life the wheel was capable of pumping 250 gallons of water a minute from a depth of 200 fathoms.

20th century

By the beginning of the 20th Century the yield from the mine had begun to decline dramatically. During the first six months of 1900 the quantity of lead sold amounted to 100 tons, generating £1,500. The amount of blende stood at 650 tons generating £4,150; however this compared to 857 tons generating £7,152 for the corresponding period of the previous year. The fall in price of lead from the previous year was £1 19s 6d per ton.
In 1901 a rich vein of lead was discovered, however during the extraction the workings let loose a large body of water. In addition at this time there was a shortage of the water supply needed to power the Laxey Wheel thereby rendering it unable to combat the flooding. The consequence of this was that water rose in the mine, gradually overwhelming the pumps, until the workings had filled to a depth of. Electric pumps were proposed to remedy the situation, but it was subsequently found impracticable to get electrically operated pumps of the required capacity down the shafts. By January 1902 although the main ingress had ended, the water level in the mine was still rising by 6 inches daily. By March 1902 some workers were being paid off, although the washing floors kept working and some men were still employed underground. The depressed market, combined with the cost of keeping the mine free of water were beginning to render the mine uneconomical. A scheme which drew the attention of the directors of the company at the time was to acquire the North Laxey & Glencherry mine, at that time also flooded, and work the two mines in unison. This idea had the approval of the Government's Inspector on Mines, Foster Brown. Whilst the mine remained significantly flooded, it only affected half of the mine, although it was the half which yielded the richer output. However it was still uncertain as to whether the flooded part of the mine could be drained economically, and if it could would it then be able to be worked without further encroachment. A report by the mining manager at the end of March stated that all workings by then were flooded to the 85 fathom level.
In a Directors Report in 1902, it was stated that up until that point the company had spent £1.75 million in developing the mine, a total of £535,625 had been paid to shareholders by way of dividends and a further £138,064 had been paid in royalties to the Crown.

Clearing the mine

The problems draining the mine continued into 1903, a major part of the problem being the ability to position pumps in the correct areas. The shafts were very restrictive in area, being approximately 4 ft x 4 ft in places, whilst in addition the shafts were crooked being generally at an angle of 15 degrees from the vertical and at a total depth of approximately from the surface. Eventually it was decided to carry out the operation using steam pumps, and an order was placed with Joseph Evans & Sons of Wolverhampton.
A large pump with a capacity of 400 gallons per minute was fixed on a sliding cradle and lowered, together with its steam and water mains, on link chains so as to follow the water down as the level subsided. At intervals down the shaft there were fixed pumps placed at various levels so as to limit the suspended pump to a lift of no greater that at any given time. In addition a fixed electrically powered pump was installed at the 255 fathom level which was capable of forcing the water up to the adit in one lift.
Joseph Evans & Sons provided all the appliances in order for the work to be carried out, which included all the steam pumping mains, chains, lifting apparatus, steam capstan engines and three Lancashire boilers accompanied by a stack. To accommodate the machinery new footings for the boilers had to be constructed, with the machinery being hauled from Douglas to Laxey by a special traction engine which had been brought over for the purpose.
The operation was protracted, but by December 1903 progress had been made with the water level reducing by approximately per month resulting in the 120 fathom level being reached by 17 December. The problems purging the shaft mainly stemmed from the fact that the pumping machinery had to be specifically designed and constructed because of the mine shaft being so narrow and of an irregular shape. By February 1904 the mine had been cleared to below the adit level. When the water was reduced below the 145 fathom level a further pump was installed which aided the operation and as the different levels were cleared, miners were able to work them.

Incidents

On Saturday 19 March 1904, a fire broke out in the Welsh Shaft at a position ten fathoms below the surface. The incident was of particular significance as a similar outbreak of fire in the Great Snaefell Mine in 1897, resulted in the deaths of 19 miners.
Prior to the main shift commencing work, a party of men had descended the Welsh Shaft to inspect the joints of the steam pumps which had been put into the mine to assist in purging water, and which were found to be satisfactory. Following this over 100 men entered the mine to begin work. At approximately 07:00hrs the boiler man at the Welsh Shaft picked up the smell of burning wood and promptly raised the alarm. Arranged signals were then used to alert those in the mine to evacuate, and in less than 30 minutes all the men were accounted for.
The position of the fire was traced to a point 33 fathoms down, a hose was brought and water pumped down to the level. Several men volunteered to descend to the level, where they found hot pieces of rock falling from the roof of the shaft. To avert the risk of a possible heavy rock fall from the vicinity of the shaft choking up the shaft below the adit, heavy timber was placed across the pit, and deflected a further fall as a result of the fire.
Water continued to be poured down the mouth of the shaft, being effective in putting out the fire, enabling men to directly extinguish the smoldering timbers and make secure the sides of the shaft.
As opposed to the Snaefell Mine, the three shafts of the Laxey Mine and the various connecting levels had excellent ventilation, and this would have aided in some way to the fire claiming no casualties.
Another incident occurred on Saturday 10 December 1904, resulting in the deaths of 4 miners.
The shift began work at 06:00hrs, with the shift due to end at 14:00hrs, the alarm being raised when 4 men failed to return to the surface. It was understood that the men in question had been working at the 190 fathom level and when it was certain they had failed to return a search party was organised with the search commencing at 15:00hrs. On reaching the 190 fathom level, approximately midway between the Engine Shaft and the Welsh Shaft, the search party saw collapsed timbers which had been used as a scaffold around what had been a covered sump the depth of which was approximately. In this case however, the sump did not go through to the lower level, but was filled with water to approximately of the covering. To the search party it was obvious that the scaffold had collapsed resulting in the men falling into the sump which contained approximately of water. Grappling hooks together with blocks and tackle were requested and at 19:00hrs the first body of a miner was recovered. Two further bodies were recovered at 21:00hrs and at 23:00hrs leaving one miner unaccounted for. The efforts to locate the body of the missing miner continued through the night, but by 04:00hrs the following morning the body had still to be located and this continued throughout Sunday 11 December, and it was not until 01:00hrs on the morning of Monday when the body was recovered.
The 190 fathom level had been used as a footway up until the flooding of the mine in 1901, and the object of sending the men to repair it was to use it in the same way. The level had been underwater for several years as a result of the flooding, and the men had been detailed to clear away debris, examine the level and prepare it for carrying out further repairs. There was speculation that the men had been testing the covering of the sump when it collapsed. It was determined that the accident occurred shortly after 11:30hrs, this been ascertained by the fact that a watch on one of the miners had stopped at that time and a watch on another miner a few minutes later. There was no evidence of a rock fall in the vicinity ruling out that as a contributory factor.
An Inquest into the deaths of the miners opened on Tuesday 13 December, presided over by the High Bailiff of Castletown, James Gell, who was deputising for Samuel Harris.
The funerals of the victims also took place on Tuesday 13 December, at Lonan Churchyard, with the service conducted by the Reverend John Quine, Vicar of Lonan. The Great Laxey Mining Company were represented by the chairman, the Mine Manager and the Mine Secretary. In addition children from Minorca Sunday School, of which John Gawne was a member and the Laxey Brass Band, of which John Quayle was a member, were also in attendance.

List of those killed

NameAge
Henry Lewis Gelling18
John Thomas Quayle40
John Thomas Gawne41
Robert Wade26

Closure

Following various short-term closures, by May 1929 rumours had begun to circulate concerning the future of the mine. By this time most of those who had worked the mine had left with many miners emigrating to South Africa, Australia or the United States of America. Continued flooding in the lower reaches of the mine combined with antiquated pumping machinery finally signified the end of mining operations at Laxey, and on the Isle of Man. However some of the spoil residue was brought to the washing floors to extract any remaining worth from it. It is thought that this continued until 1934 when all working finally ceased.