Kohinoor square is a 52-story semi-twin, mixed-use skyscraper located on the land previously owned by Kohinoor Mills in Shivaji Park, Mumbai, India. It is situated at the junction of LJ Road and Gokhale Road. It is one of the first skyscrapers in India to achieve a LEED gold rating for environmental sustainability. The Kohinoor Square complex comprises a main skyscraper and a residential skyscraper which are for mixed use. Houses, hotels, residences and a high-end shopping malls are being constructed by Kohinoor CTNL Infrastructure Corporation.
Planning
The architect and structural engineering company in charge of Kohinoor Square is the Indian firm SSA Architects, in collaboration with Gkkworks. The Indian structural engineering company Larsen & Toubro acted as the main structural engineer in collaboration with Siemens. Kohinoor Group had made a contract with various other companies to construct one of India's first skyscrapers to achieve a Leadership in Energy and Environmental Design Gold rating for environmental sustainability. The building is one of the tallest mixed-use buildings in India, as well as one of the tallest in South Asia as of 2013. The main building will contain the hotel, a 42-suite luxury hotel on the top five floors of the main building. It would be operated by the Singapore-based hotelier group GHM Hotels under the brand name of The Aayu Mumbai. It would include restaurants like L'Atelier de Joël Robuchon run by the chef Joël Robuchon, and a Japanese culinary restaurant operated by Chef Hide Yamamoto. On lower floors, the shopping mall would be leased to various luxury boutiques by the Group.
History
The Kohinoor Square project started when Kohinoor Group Pvt, Ltd. won the bid to develop the Old Kohinoor mills located in Shivaji Park, at a price of, including for the land. It is located on the land previously owned by Kohinoor Mills. In 2004 the land was sold to Kohinoor Group. It was originally planned to be the tallest office building in India. Construction started in 2009, and in 2013 the plans were changed from making it the tallest hotel building in India due to local market reasons.
Construction
Construction of the Kohinoor Square started in early 2009, with a completion date of March 2013, with a construction period of four years. Most of the time the construction remained on schedule. But later in 2012, construction slowed down due to the legation of the Floor Space Index on Car Parks with the Brihanmumbai Municipal Corporation and design change from a full Office building to a Mixed use building. In December 2012, Kohinoor Square main building officially topped out becoming The Tallest Mixed use building in India. Later, on 26 July 2013 the issue regarding the Floor Space Index on car parks was resolved in supreme court, and with an estimated completion date of December 2013 the construction resumed again. Construction on the residence building started in late, 2010 and completed in March 2014.
Design
The main skyscraper is about 52 floors, and the residential skyscraper is about 35 floors. The first five floors of the main building will be used for a high-end shopping mall, and the remaining 47 floors of the main building will be utilized for a five-star hotel and commercial offices. The first 15 floors of the residential building will be used as a parking garage for both the buildings, and the remaining 20 floors will be residences. It will have 40 elevators and 12 escalator in the main building and 8 elevators in the Residence Building provided by Otis. Kohinoor Square project is going to cost around, including for the land. The whole complex houses an area of, with the main building housing a total floor space of, with an average area of per floor plate and has an average height of per floor. The whole complex can accommodate more than 2000 vehicles in the Car Parks located in the 1st to 15th floors of Residence Building with the Innovative technology such as efficient driveways and intelligent traffic management system. The main building houses spacious lobby and double height landscaped Sky Gardens and a double height terraces with floor to ceiling glazing on every alternate floor to act as tranquil and refreshing breakout zones.
Main building (Central Tower)
At 50 stories, one of the towers will be among India's tallest office buildings. The structure comprises a concrete core and post-tensioned concrete slab and spandrel beams. The façade consists of faceted unitized aluminum curtain walls with provisions for high performance double glass façades on the tower. The towers are linked by a podium with a façade of custom point-supported glazing on specialty steel trusses. All the Glasses are articulated glasses & can sustain design wind pressure of 4.5 to 5.0 kPa. Diamond edges of the building having aluminum flashing with LED lighting are the unique feature and make it complicated façade design. The Façade Consists of Façade LED Lighting in the spandrel panel which gives a dynamic look in the night.
Eco-friendly design features
The building design makes it environmentally friendly, using technologies such as floor-to-ceiling insulated glazing to contain heat and maximize natural light, and an automatic daylight dimming system. The tower also features a greywater system, which captures rainwater for reuse. Kohinoor Group Pvt Ltd. states that the building is made largely of recycled and recyclable materials. Air entering the building is filtered, as is common, but the air exhausted is cleaned as well. The Kohinoor Square Building is one of the first Skyscraper building in India to achieve a Gold Certification from Green Building Council.