;First Kingston Railway Bridge and its 1907-built replacement The present bridge was designed by J W Jacomb Hood and built in 1907, replacing a cast-iron bridge designed by J E Errington, first discussed in 1860 and completed in 1863. ;Design specifications The bridge has five arches: three span the Thames; two span dry land, which on the Kingston bank includes a road. The bridge has elevated track approaches varying from on viaduct to on embankment, which navigate curves and fly over an urban grid of roads. ;Former industrial surroundings Twin power stations were close to the bridge on the Kingston bank from 1893 to 1959 as to one and from 1948 to 1980 as to the later. Being close to the Thames, coal came up river by barge, and ash was sent away the same way. The barge dock was constructed at Kingston Railway Bridge close to the present the upstream entrance to Canbury Gardens. Much of these sites has been landscaped for public park use and accommodates high-specification 21st century mid- and high-rise apartments.
Operational use
The bridge carries the South Western compass sector operator's suburban Kingston Loop, with trains starting and ending at its sole London terminus: Waterloo. The loop diverges from main lines at New Malden and Twickenham. Within 400 m along the line from the bridge are Kingston and Hampton Wick. The loop returns to the south bank of the Thames via Richmond Railway Bridge on the combined, major Windsor and Reading line. The loop also feeds a branch line, the Shepperton Branch Line.
Complementary uses
When part of the Kingston Loop is unable to operate, the bridge enables continued passenger services, typically using the capacity of bay platform 1 at Kingston railway station, the only example on the loop. The Shepperton Branch Line branches off the loop about halfway between the two Thames bridges, and the capacity of a bay platform means various service patterns have been used since the bridge was built. Both lines are used entirely for stopping services, except when either main line is diverted, more typically the Windsor and Reading lines which must be diverted via Kingston or via Hounslow when the busiest stretches of that line are being repaired. The loop has Strawberry Hill maintenance depot which can accommodate a few regular trains.