King Street Transit Priority Corridor


The King Street Transit Priority Corridor is a transit mall located along King Street between Jarvis and Bathurst Streets in Toronto, Ontario, Canada. It passes by two subway stations on Line 1 Yonge–University. The corridor was created by the King Street Pilot Project to improve streetcar reliability on downtown King Street. The corridor went into operation on November 12, 2017, and was made permanent by City Council on April 16, 2019. The corridor is long and spans 18 street intersections.

Description

The corridor extends along King Street between Jarvis Street at the east end and Bathurst Street at the west. Private vehicles are allowed to use the corridor, but they may only travel up to three blocks along it before they are required to turn right out of the corridor. Other private vehicle restrictions include:
Most streetcar stops are far-side, with only the westbound stops at Portland and Bathurst Streets being near-side. Passengers board streetcars from delineated loading areas in the curb lane with barricades at each end to protect waiting passengers from traffic. Downtown Express buses along the corridor have separate stops from streetcars to avoid passenger and vehicle congestion.
Prior to the pilot project, the two curb lanes along King Street were used for rush-hour traffic and for parking in the off-hours. After the creation of the corridor, space in the curb lanes was converted for other uses such as seating, patios and bicycle parking in order to make the street more pedestrian-friendly. In 2018, three dozen streetscape improvements were made including eighteen patios, two mini-parks and a number of spaces for artists and public displays. Fifteen patios were associated with private businesses that must pay the City a fee; three other patios were sponsored by businesses for public use. One space by Roy Thomson Hall is decorated by a wall of plastic crates holding planters separating a sitting area from the streetcar lanes. Another space east of Church Street has a road mural called "King's Buried Treasure" to commemorate former creeks long since buried.

Routes serviced

The corridor is used by the following TTC routes:
RouteNameAdditional Information
141Downtown / Mt. Pleasant ExpressRush-hour service only; extra fare required
142Downtown / Avenue Road ExpressRush-hour service only; extra fare required
143Downtown / Beach ExpressRush-hour service only; extra fare required
144Downtown / Don Valley ExpressRush-hour service only; extra fare required
145Downtown / Humber Bay ExpressRush-hour service only; extra fare required
304KingBlue Night Streetcar service; eastbound to Broadview station and westbound to Dundas West station
503Kingston RoadStreetcar; weekday daytime service; eastbound to Victoria Park Avenue from York Street
504AKingStreetcar; westbound to Dundas West station and eastbound to Distillery Loop
504BKingStreetcar; eastbound to Broadview station and westbound to Dufferin Gate Loop
508Lake ShoreStreetcar; rush-hour service only; eastbound to Parliament Street and westbound to Long Branch Loop

Effective November 25, 2019, the Downtown Express buses are operating in the corridor on a trial basis. Route 503 Kingston Road was upgraded from rush-hour only service to include midday service on a trial basis effective September 3, 2019.

Service history

Initially, the principal routes using the corridor were the 504 King and 514 Cherry, which overlapped through the corridor. However, effective October 7, 2018, the 514 Cherry route was discontinued and replaced by two new branches of route 504 King, both of which also overlap through the corridor.
On February 20, 2018, route 503 Kingston Rd was modified from rush-hour only to full weekday service to increase capacity to support ridership in the corridor, which had increased along downtown King Street during the King Street Pilot Project. Along with this change, route 503 was extended west from York Street to Spadina Avenue and turned back at Charlotte Loop. As of January 7, 2019, the 503 route returned to shuttle bus operation to accommodate some construction projects; the 503 terminus was moved back to York Street. Effective September 3, 2019, 503 Kingston Rd service was again upgraded to run midday as well as during rush hours on weekdays.
On September 3, 2019, the TTC reintroduced rush-hour route 508 Lake Shore. It runs through the corridor eastbound in the morning peak period, and both ways during the afternoon peak. On November 25, 2019, five TTC Downtown Express bus routes began operating along the corridor.
Effective November 25, 2019, on a trial basis, the Downtown Express buses were relocated to the corridor in order to avoid traffic on their former route along Richmond and Adelaide Streets. All Downtown Express routes pass both St. Andrew and King subway stations.

Development of the corridor

Earlier efforts

In 1993, the streetcar tracks along King Street between Dufferin and Parliament Streets were made reserved lanes for streetcars and taxis only during rush hours. Other road traffic was to use the curb lanes during rush hours when parking and stopping would be prohibited. This effort to improve rush-hour streetcar service failed as there was insufficient police enforcement to prevent illegal parking, resulting in motorists continuing to drive on the tracks.
On March 22, 2007, the TTC proposed a pilot project for a transit mall along King Street, to be implemented in mid-2008. The proposal suggested reserving the centre lanes for streetcars and making a single lane in one direction available to private vehicles, taxis and delivery vehicles, alternating the lane direction on different blocks. The street would have been closed entirely to through traffic and streetcars would run at grade, not in a raised median. This arrangement could eventually have led to the trial implementation of a transit mall on King between Bay Street and Spadina Avenue, with hopes of eventually closing King to cars from Dufferin Street to Parliament Street. Local merchants and restaurateurs opposed the proposed transit mall.

King Street Pilot Project

While the 2007 pilot project was not implemented, proposals for some kind of transit priority corridor were revived in 2016 when the City of Toronto's "King Street Visioning Study" proposed a transit and pedestrian corridor on King Street through downtown.
In February 2017, as part of the King Street Pilot Study, City staff proposed three options, one of which would be submitted to City Council for approval in July and implementation as a pilot in the fourth quarter of 2017. One of the three options was similar to the 2007 proposal. All three options forbade left turns, and two options forced automobile traffic to leave King Street by a right turn after travelling only one block. All three options aimed to reduce automobile interference with streetcar operation between Bathurst Street in the west and either Parliament Street or Jarvis Street in the east.
On July 6, 2017, Toronto City Council—by a vote of 34 to 4—approved a one-year, $1.5-million pilot project to improve streetcar service along King Street between Bathurst and Jarvis Streets. The project would limit automobiles to travel only one block before being forced to turn right, and left turns would be prohibited. However, over the objections of the TTC, Council granted taxi cabs an exemption on the ban against through traffic between 10pm and 5am. The TTC said that King Street is busy overnight, forcing streetcars to slow down to between.
On October 23, 2017, the City of Toronto published a plan for the King Street Transit Pilot showing the location of streetcar stops and traffic restrictions between Bathurst and Jarvis Streets. The pilot project went into operation on November 12, 2017, and was expected to last one year. The following changes were made for the pilot:
After 16 days of operation, University of Toronto researchers determined that the transit mall had reduced the mean travel time for streetcars by 24% westbound and 20% eastbound during the evening rush hour. Only 1.3% of streetcars took more than 25 minutes to travel between Jarvis and Bathurst Streets during the evening rush hour versus 19% prior to the pilot. However, crowding on routes 504 and 514 had increased, forcing riders to wait for room to board as several streetcars passed; improved travel times increased demand for streetcar service through the transit mall. To address the increased demand, the TTC started to assign two Flexity streetcars, plus future Flexity deliveries from Bombardier, to route 504. This was in addition to the 10 Flexity streetcars on route 514 and 44 CLRVs on route 504. The City's Transportation Services department had yet to adjust traffic light timings to give more green-light time for streetcars within the transit mall.
By December 12, 2017, City staff reported that the transit mall had reduced streetcar travel time during the morning rush hours from 15.3 to 14.9 minutes eastbound and from 15.2 to 14.3 minutes westbound. During the evening rush hours, travel time was reduced from 18.9 to 17.6 minutes eastbound and 19 minutes to 16.4 minutes westbound. The mall allowed better spacing of streetcars, reducing the problem of streetcar bunching. The mall had little impact on traffic on neighbouring streets. Statistics differed between the U of T analysis and the City's because different pre-pilot periods were selected and because the U of T study had collected data for a shorter period. At the time of the City's analysis, traffic signal timing had not yet been changed to improve streetcar speeds.
By mid-January 2018, the TTC had released its own analysis, which found that morning rush hour ridership had increased 25% along King Street after implementation of the transit mall and that the average travel time through the transit mall had decreased by 14%. The TTC temporarily replaced streetcars on routes 505 Dundas and 506 Carlton with buses and reassigned those streetcars to other routes, such as 504 King, to handle crowding from increased ridership.
The Ontario Restaurant Hotel and Motel Association reported that 26 restaurants located within the King Street theatre district saw revenue drop by 41%. Restaurateurs attributed the declining revenue to driving restrictions and the removal of on-street parking within the corridor. The City started a campaign to attract customers to local businesses along the mall, such as a public space design competition, street performers, warming stations and special promotions. In January 2018, to attract automobile customers, the City offered up to $10 in free parking at municipal parking lots in the area.
By May and June 2018, streetcar ridership along King Street had increased overall by 11% since the King Street Pilot Project had started. Ridership had increased 35% in the morning rush hours and 27% during the evening rush hours. Average travel time at midday was reduced by 2 minutes and by 4 to 5 minutes during the afternoon. 85% of streetcars operated on a headway of 4 minutes. The City found that retail business in the area had increased by 0.3%, although some restaurateurs in the John Street area still complained of lost business due to the pilot.
In early July 2018, the City activated transit signal priority along the transit mall. With this improvement, streetcar travel time along the mall was reduced on average by 30 to 126 seconds depending on direction; the change particularly benefitted eastbound streetcars during the evening rush hours. TSP reduced the chances of a streetcar being stopped at a red light, saving an average of 8 seconds per signaled intersection. A transponder on the streetcar notifies TSP of a streetcar approaching a signaled intersection; TSP could then extend a green light or shorten a red light facing a streetcar.
On December 13, 2018, Toronto City Council voted 19 to 3 in favour of extending the pilot until July 31, 2019. City staff wanted more time to collect and analyze data before recommending whether to make the pilot permanent.

Permanent corridor

In April 2019, a City staff report dubbed the transit mall the "King Street Transit Priority Corridor". On April 16, 2019, City Council voted 22 to 3 in favour of making the pilot permanent. From the beginning of the pilot, weekday rush-hour ridership had increased from 72,000 to 84,000 passengers, while people movement had also increased and vehicle traffic had decreased in the pilot area. City staff were considering adaptations of the pilot to other routes. Other cities were examining the pilot to possibly emulate it. However, City staff reported that growth in retail spending fell from 2.5% the year before the pilot to 1.7% during the project.
In November 2019, new raised streetcar loading platforms were installed at the Portland Street and Peter Street stops for evaluation. Both ends of the platform have a bicycle ramp to allow the platform to double as part of a bicycle path. Cyclists are not allowed to cross the platform when passengers are boarding or alighting a streetcar. When a streetcar is not present, waiting streetcar passengers must stand in a white-coloured area behind a yellow tactile divider to allow bicycles to pass. The new platforms use former road space to make more room for pedestrians.