Kerala State Electricity Board


Kerala State Electricity Board Ltd is a public sector undertaking under the Government of Kerala, India, that generates,transmits and distributes the electricity supply in the state. Established in 1957, the agency comes under the authority of the Department of Power.It has been registered under indian companies act during January 2011

History

The history of electricity in the state is around one century old. The first effort in this direction was a private endeavour. Electricity was first brought to the state by a British company – the Kannan Devan Hill Produce Company, Munnar. The first generating station of the state was set up on the right bank of a tributary of River Periyar in 1910. It was a hydroelectric project and that tributary named Mudirappuzha continues to be the site of large a number of hydroelectric projects in the state.
After a spell of 17 years, the attention of the state authorities turned to newer forms of generating energy. The Government of Travancore set up a facility to supply electricity to the households of Thiruvananthapuram town. In 1927, a Thermal Power Station was established under government ownership at Thiruvananthapuram for production of electrical energy on commercial lines. Three oil engine generators, of a capacity of 65 kW each, were installed and commercial production started in 1929. This station was located at Thampanoor at Thiruvananthapuram. An Electrical Wing under the State Public Works Department was entrusted with the administration of the scheme.
The next significant development was the formation of a separate department for electricity in 1932 by His Highness Sri Chithirathirunal Maharaja and his Diwan Sir C P Ramaswami Iyer. The formation of the Electricity Department paved the way for notable developments in the field. Thermal generating stations were set up at Kollam, Kottayam and Nagercoil in 1934. By that time, the possibilities of hydroelectric generation attracted the attention of the technologists and the authorities.
Kerala being a land of mountains and rivers, it presented a fertile field for hydroelectric generation. The vast potential for hydroelectric generation in the state prompted the state authorities to take steps to establish stations for hydroelectric generation. The first of these ventures was the Pallivasal Hydroelectric Project, the construction of which was started in 1933. The first stage of the project was commissioned in 1940. Its capacity was 13.5 MW. By that time, a comparable electric transmission network had also been completed with 66 kV substations at Alappuzha, Mavelikkara, Kothamangalam, Kundara, Kalamasserry, Viyyur, Aluva, and Thiruvananthapuram, which were also commissioned in 1940 itself during April -May months
The Kerala state Electricity board started functioning under the direction of a newly formed Kerala government, on 31 March 1957. The first governing body consisted of 5 members, and was headed by the chairman K P Sreedhara Kaymal. The staff of the erstwhile Department of Electricity of the Thiru-Kochi state were transferred to the KSEB.
At the time of its inception, in 1958, the KSEB had an installed capacity of 109.5 MW, with a total annual internal generation of 441.35 MU. Over the years, as demand increased, the board has imported power from neighbouring states and private entities.As per the Central Electricity Act 2003, KSEB was converted to Kerala State Electricity Board Limited in 2014. The original KSEB was dissolved and its assets and liabilities transferred to the government initially and then transferred to the newly formed company KSEB Limited.

Organizational Structure

The Kerala State Electricity Board, constituted by the Government of Kerala, by order dated 7 March 1957, under the Electricity Act, 1948 is in the business of Generation, Transmission and Distribution of electricity and striving to provide quality electricity at affordable cost to all classes of consumers in the state of Kerala.Kerala State Electricity Board commenced functioning on 31 March 1957 After Noon as per order no. EL1-6475/56/PW dated 7 March 1957 of the Kerala State Government. It had 5 members with Sri K P Sreedharan Nair as chairman. All the staff belonging to the erstwhile Electricity Department was transferred to the Board. The 'Board' consisting of the chairman and the Members is the Supreme Governing Body.
The State Government by their notification EL3-9345 dated 21 February 1958 constituted the State Electricity Consultative Council under section 16 of the Electricity Supply Act. The Council functions as consultative body and the Board is required to place before the council the annual financial statement and supplementary statements if any before submitting such statements to the State Government.
The 'Board' consisting of the chairman and the Members is the Supreme Governing Body. The Board consists of seven members and is headed by the chairman.The Government of Kerala and KSE Board issued orders for the restructuring of KSE Board into profit centres in April 2002. Members head the profit centres. There is a Corporate Office to co-ordinate and control the activities of the Board.
After the enactment of Electricity Act, 2003, KSEB has been functioning as the State Transmission Utility and a distribution licensee w.e.f 10 December 2004 under section 172 of the Electricity Act, 2003. The Central Government had approved the continuation of KSEB as a State Transmission Utility & Licensee only up to 24 September 2008. In exercise of the powers conferred under sub-sections,,, and of section 131 and section 133 of the Electricity Act 2003 the Government of Kerala had issued notification vide G.O. No.37/2008/PD, Dated, Thiruvananthapuram, 25 September 2008 for the purpose of vesting of functions, properties, interests, rights, obligations and liabilities of the Kerala State Electricity Board in the State Government on such terms as agreed to by the Kerala State Electricity Board and the State Government and re¬vesting thereof by the State Government in a Corporate entity and also for the transfer of Personnel of the Board to the Corporate entity and for determining the terms and conditions on which such transfers and vesting shall be made. Accordingly, with effect from 25 September 2008, all the functions, properties and all interests, rights in properties, all rights and liabilities of the Board are vested in the State Government. The Kerala State Electricity Board Limited has been incorporated under the Companies Act, 1956 on 14 January 2011 and started operations as independent company with effect from 1 November-2013.The original KSEB was dissolved and its assets and liabilities were transferred from government to the newly formed company KSEB Limited.

Generation

KSEB Ltd has 31 hydro-electric projects, 7 solar projects,2 diesel power plants & 1 wind farm.Power generation is also undertaken by Captive Mode Projects, Independent Power Mode Projects & Co-generation mode projects other than KSEBL.About 25% of the energy requirement is being met from hydel plants owned and operated by KSEBL.As of December 2019, The total installed capacity is 2823.01 MW
The below list contains power generation projects in Kerala owned by KSEB, Captive Mode Projects, Independent Power Mode Projects & Co-generation mode projects.

Hydro Electric Projects

Fossil Fuel Projects

Wind Farms

Solar Projects

Transmission

The Kerala power system grid is connected to the Southern Region Transmission system through 400 kV double circuit lines. They are
There are 6 major inter-state transmission lines at 220 kV level and 110 kV level.
The 220 kV lines are:
The 110 kV lines are:
The major substations include five 400 kV substations, and 17 220 kV substations. The main grid comprises the 220 kV systems.
The transmission sector of KSEB comprises two zones namely North and South. The State Load Dispatch Centre located at Kalamassery.
CapacityNo. SubstationsLine length in Circuit KmReliability Index
400 kV5*378**99.96
220 kV172701.3897.75
110 kV129400498.25
66 kV83238797.86
33 kV114143092.99

400 kV Substations at Pallipuram – Thiruvananthapuram, Pallikkara – Kochi, Palakkad and Kozhikode are owned by PGCIL, while 400 kV Substation at Madakkathara, Thrissur is owned by KSEB. 400 kV Substation, Madakkathara is the first 400 kV substation in Kerala.

Distribution

KSEB Ltd distributes electricity in the State of Kerala except in the administrative region of Thrissur Municipal Corporation and Munnar. For operational conveniences the distribution wing is divided into four zones: South, Central, North and North Malabar.

Electricity Tariff

Kerala State Electricity Board Tariff consists of different components.The charges levied on consumers include Fixed Charges,Meter Rent, Energy Charges,,Fuel Surcharges,Electricity Duty & applicable local taxes.
KSEB follows a slab system in which a consumer using up to 250 units per month will have a telescopic tariff.This means that the first 50 units will be charged at a lower rate, with the rates increasing progressively for subsequent 50 units.After 250 units, the billing will be ‘non-telescopic’, which means the slab rate will be applicable for the entire electricity consumed.
The following table shows the electricity tariff for domestic consumers

Tariff for Monthly Consumption (Upto 250 Units)

For Three phase customers having a monthly consumption upto 100 units,the fixed charges are set as Rs 90 and Rs 100 for upto 250 units.

Tariff for Monthly Consumption (Above 250 Units)

For Three phase customers the fixed charges are set as Rs 110 for consumers having a monthly consumption upto 350 units,Rs 120 for upto 400 units,Rs 130  for upto 400 units and Rs 150 for consumption above 500 units.