Kambarata-2 Hydro Power Plant
The Kambarata-2 Hydro Power Plant is a hydroelectric power station in on the Naryn River in Kambar, Kyrgyzstan. It has 3 individual Francis turbine-generators with a nominal output of around 120 MW each which will deliver up to 360 MW of power. The first generator was operational on November 27, 2010. The power plant's dam is tall and it creates a reservoir of which is active for power generation.