Kalibo International Airport


Kalibo International Airport is an international airport that serves the general area of Kalibo, the capital of the province of Aklan in the Philippines, and is one of two airports serving Boracay, the other being Godofredo P. Ramos Airport also known as Caticlan Airport in the town of Malay. It is the fastest growing airport in the Philippines in terms of passenger traffic with more than 50% growth in 2010, and 2nd fastest for seats offered for June 2014 over the corresponding month of the previous year. The airport is classified as an international airport by the Civil Aviation Authority of the Philippines, a body of the Department of Transportation and Communications responsible for the operations of all airports in the Philippines except major international airports.
The airport is situated east of the main area of Kalibo and from Caticlan port in Malay.

Expansion and development

On March 31, 2008, construction of the airport's new terminal building commenced. The said construction is part of the 130-million peso fund pledged by President Gloria Macapagal-Arroyo in 2007 for the upgrade of the airport which is being geared to become an international landmark for tourism. The package includes 80 million pesos for the new terminal, while 50 million was released in 2009 by the Department of Budget and Management for the installation of an Instrument Landing System.
The Kalibo International Airport has one of the busiest international flight activity in the Western Visayas. Regular and chartered flights accommodate thousands of travelers during the holidays from Asian routes to the capital town of Kalibo.
A 200 metre extension of the runway was due to open by the end of 2017, which would extend the current 2187 metre runway to 2387 metres.
The construction of the new terminal building is to start as soon as possible. There is also to be widening and extension of the apron and expansion of the tarmac, plus additional aircraft parking, airport lights and vehicular parking.
A P17.9-million expansion and rehabilitation project for KIA terminal building was held in July as Build, Build, Build program of the government has been pushing for the development and expansion of existing infrastructures such as airports.

Airlines and destinations

Statistics

Calendar year
Passenger movement
% change
Cargo movement
in metric tonnes
% change
Aircraft movement
% change
2003229,8501,867,7893,142
2004246,355 7.181,518,474 18.705,750 83.00
2005242,183 1.691,642,403 8.163,148 45.25
2006343,346 41.771,674,593 1.963,918 24.46
2007470,169 36.941,931,145 15.324,300 9.75
2008400,042 14.911,508,760 21.874,634 7.76
2009649,797 62.431,809,744 19.958,910 92.27
20101,005,845 54.791,776,351 1.8414,504 62.78
20111,378,535 37.051,905,813 7.2915,612 7.64
20121,832,168 32.901,750,579 8.1418,346 17.51
20132,255,543 18.771,673,299 4.4118,500 0.35
20142,321,162 9.721,670,874 0.1419,108 3.19
20152,378,147 2.401,706,549 2.0920,576 7.13
20162,711,036 12.281,750,000 2.4820,962 1.84
20172,520,168 7.043,711,843 112.1021,861 4.28