Hvalfjörður Tunnel


The Hvalfjörður Tunnel is a road tunnel under the Hvalfjörður fjord in Iceland and a part of Route 1. It is long and reaches a depth of below sea level. Opened on 11 July 1998, it shortens the distance from Reykjavík to the western and northern parts of the island by. Passing the fjord now takes 7 minutes instead of about an hour.
Spölur was the company that constructed, and is now the owner and operator of the tunnel, while the Verkís company handled almost all of the design. This project was a milestone in Icelandic construction as it was the first private finance initiative without direct funding by the state treasury. It is also the only tunnel where tolls were charged.

Construction

The construction of the tunnel was started in 1996, and completed in 1998 at a cost of about ISK 5,000 million. The tunnel was designed for annual average daily traffic of 5,000 vehicles.
While the sub-sea tunnel deepest point is below sea level, the deepest sea depth is, and the minimum rock coverage is.

Tolls

The tunnel is toll free as of 28 September 2018. Previously, the toll for vehicles less than in length was ISK 1,000. Motorcycles and larger vehicles paid different tolls. Pedestrians and cyclists are not permitted. The money went to pay for the construction of the tunnel by Spölur.
The original plan assumed it would take 20 years to pay back the cost of building the tunnel and that the tunnel would be turned over to the state at that point, but the traffic volume has proved to be significantly higher than originally projected. The volume of traffic is so high that the operator of the tunnel has suggested building a new tunnel alongside the current one because traffic is reaching the threshold mandated by a European regulation under which traffic in opposing directions should be separated.

Safety issues

The Hvalfjörður Tunnel received a bad rating in the 2010 European tunnel test, which is carried out annually by the German automobile club ADAC.
Different aspects were criticized and are also mentioned in the EuroTAP test, especially the weak lighting, absence of an automatic fire alarm system, too weak ventilation in case of a fire and distance to the next fire station. There are alcoves every to facilitate turning around, and the storage capacity for water leakage is.
Between 2007 and 2013, several improvements to the tunnel's security were made, according to the newspaper Morgunblaðið resulting in a doubling of the tunnel's security level. The improvements included better lighting, setting up a monitoring system, new emergency lights and more fire extinguishers.