Hinkley Point B is a nuclear power station near Bridgwater, Somerset, on the Bristol Channel coast of south west England. It was the first commercial Advanced Gas Cooled reactor to generate power to the National Grid in 1976 and shares its design with sister station Hunterston B nuclear power station.

History

The construction of Hinkley Point B, which was undertaken by a consortium known as The Nuclear Power Group, started in 1967. The reactors vessels were supplied by Whessoe, reactor machinery was supplied by Strachan & Henshaw and the turbines by GEC.
In March 1971 it was announced that there would be a six-month delay in completion due to problems with the insulation of the concrete pressure vessel. In place of the stainless steel mesh and foil insulation that had been used on previous Magnox stations, a fibrous type of insulation supplied by Delaney Gallay, part of the Lindustries Group, had been used for the first time. During pre-operational trials, before the nuclear fuel was loaded, high levels of acoustic vibration in the gas circuit were found to be damaging the insulation tiles, and the retention plates which held the insulation in place had to be redesigned and modified within the reactor.
During further pre-operational testing, severe vibration of the fuel channel gags was detected. The fuel channel gags are valves which are gradually closed to restrict the flow of gas through a fuel channel in order to maintain the channel gas outlet temperature as the nuclear fuel is used up. Modifications to produce a fluidically generated bias force to stop the gags vibrating took time to design, test and implement, delaying the planned start up date. The station began generating electricity on 5 February 1976.
It was taken over by Nuclear Electric as part of the privatisation of the UK Electricity Supply Industry in 1990, though remaining in public ownership at that time. In 1996, the AGR and PWR assets of Nuclear Electric and Scottish Nuclear were privatised as part of British Energy.
In 2006 the station's reactors were shut down in order to inspect the boilers for microscopic weld defects that had been found in power stations using similar boiler designs. While it was implied in the media that these were major holes gushing steam, had this been the case the loss of pressure would lead to an automatic shut down to prevent damage. Due to its age, on 16 August 2006 the company warned that until a decision was made over whether to extend its usable life it would operate at a maximum of 70 per cent load. Both reactors were subsequently restarted generating 420 MW each, roughly 70% of full capacity. The number 4 reactor was cleared for restart by the Nuclear Installations Inspectorate on 11 May 2007.
The power station's current accounting closure date is 2023.
In July 2013, EDF Energy announced that the load on both of the station reactors had been increased to 80 per cent, resulting in an output of around 485-500MWe per reactor up from 70 per cent load, where it had been generating around 420MWe per reactor since 2006.
Hinkley Point B is the only one of four nuclear power stations in the area which is operational, the others being decommissioned are the adjacent Hinkley Point A together with Oldbury and Berkeley on the banks of the River Severn.
In October 2016 it was announced that super-articulated control rods would be installed in the reactor because of concerns about the stability of the reactors' graphite cores. The Office for Nuclear Regulation had raised concerns over the number of fractures in keyways that lock together the graphite bricks in the core. An unusual event, such as an earthquake, might destabilise the graphite so that ordinary control rods that shut the reactor down could not be inserted. Super-articulated control rods should be insertable even into a destabilised core.

Specification

The station is of the advanced gas-cooled reactor type with two 1600 MWt reactors, each with their own 660 MWe steam turbine generator set giving a combined maximum design generating capacity of 1250 MW. As of 2013 it provided over 1% of the UK's total power output.

Comparison With Hinkley Point A

A comparison With Hinkley Point A is shown below.
See also comparison of Hinkley Point A, B and C
ParameterHinkley Point BHinkley Point A
Output of Main Turbines2 x 660 MW 1250 MW6 x 93.5 MW 500 MW
Area of Main Station8.1 ha 16.2 ha
Fuel Per Reactor122 t 355 t
FuelUranium Oxide slightly enriched in ceramic formNatural Uranium
Fuel CansStainless SteelMagnox
Fuel Surface Temperatureabout 825 Degrees Celsiusabout 430 Degrees Celsius
CO2 Pressure41.4 bar g 12.7 bar g
CO2 Channel Outlet Temperature665 Degrees Celsius387 Degrees Celsius
Number of Channels per Reactor3084500
Total Weight of Graphite per Core1199 t 1891 t
Steam Conditions Turbine Stop Valve HP160 bar g 538 Degrees Celsius45.5 bar g 363 Degrees Celsius
Steam Conditions Turbine Stop Valve IP/ReheatReheat 38.9 bar g 538 Degrees CelsiusIP 12.7 bar g 354 Degrees Celsius

Capacity and output

The generating capacity, electricity output, load factor and thermal efficiency was as shown in the table.
YearNet capability, MWElectricity supplied, GWhLoad as percent of capability, %Thermal efficiency, %
19799323,342.94163.835.23
198111345,540.62862.637.17
198211345,810.48363.837.22
198410407,406.76781.137.68

Future of the station

The current estimated decommissioning date for the station is set for 2023, which was established in 2012 when the station's owner EDF Energy announced a seven-year extension, taking the decommissioning date from 2016 up to 2023.

Proposed Hinkley Point C

A new 3,260 MW Hinkley Point C nuclear power station, consisting of two EPR reactors, was given planning consent on 19 March 2013.
A guaranteed "strike price" of £92.50 per megawatt-hour was announced on 21 October 2013. The new power station would see Hinkley's contribution to the country's power supply rise to 7%. At the time of the planning consent, the price for electric energy on the wholesale market was around £45 per megawatt-hour while the new power plant was expected to need earnings of £90 per megawatt-hour in order to break even.
The EU gave its consent to the 'Contract for Difference ' that guarantees the "strike price".
Greenpeace Energy have announced that they have mandated 'Becker Büttner Held' to file a lawsuit against the EU commission.