Hefei–Bengbu high-speed railway


Hefei–Bengbu high-speed railway is a high-speed rail line between Hefei and Bengbu in Anhui province. It is a part of the future Jingfu line connecting Beijing and Fuzhou, Fujian.
Construction started in January 2009. The railway was opened on October 16, 2012.
With the fastest trains on the new line, the travel time from Hefei to Beijing South railway station is only four hours. Besides the Hefei-Beijing trains, there is also direct service from Hefei to Qingdao, via Jinan and the Jiaozhou–Jinan high-speed railway.
The total estimated investment is 13.6 billion yuan. The design speed is. It is part of the Jingfu line connecting Beijing and Fuzhou, Fujian.
There are 8 stations along this line.