Hangzhou–Changsha high-speed railway


Hangzhou–Changsha high-speed railway is a China Railway High-speed line connecting Hangzhou, Nanchang, and Changsha, respectively the provincial capitals of Zhejiang, Jiangxi, and Hunan. This railway forms a section of the Shanghai–Kunming high-speed railway, part of the National Railway Grid Network, as one of the four major east-west lines.
It has a total length of. Construction started in December 2009 and was opened to traffic on December 10, 2014. With trains from Hangzhou to Nanchang taking 2 hours 14 minutes, Hangzhou to Changsha in three hours and 36 minutes.

Route

The route from east to west starts at Hangzhou East and makes stops at Hangzhou South, Zhuji, Yiwu, Jinhua, Longyou, Quzhou, Jiangshan, Yushan South, Shangrao, Yiyang, Yingtan North, Fuzhou East, Jinxian South, Nanchang West, Gao'an South, Xinyu North, Yichun, Pingxiang North, Liling North, for a total of 21 stations when it reaches Changsha South.

History

Preparation

Construction accident

March 17, 2011 – A tunnel collapsed during construction in Hangzhou's Xiaoshan District, killing two people and one person slightly injured.