Gouina Hydroelectric Plant


The Gouina Hydroelectric Plant is a run-of-the-river-type hydroelectric installation currently being constructed on Gouina Falls along the Senegal River in Mali. It is located about southeast of Diamou in the Kayes Region. It is the fourth project of the Senegal River Basin Development Authority and its ground-breaking ceremony on 17 December 2013 was attended by the heads of state of each member country. Mauritanian President Mohamed Ould Abdel Aziz laid the foundation stone. Preliminary construction had been suspended due to the 2012 Malian coup d'état and subsequent Northern Mali conflict. The plant is expected to be complete in 2020 and will provide power to Mauritania, Mali and Senegal. The plant will cost US$329 million and the of transmission lines will cost US$65 million. The project is receiving 85 percent of its funding from the Exim Bank of China along with US$1 million from the EU-Africa Infrastructure Trust Fund and US$1.4 million from the International Development Association and European Investment Bank.
It will have an installed capacity of and will use the outflows of the Manantali Dam upstream to regulation water flow into the plant. A long weir just above the water fall will direct water into a channel which will feed the power house just downstream of the falls. The power house will contain three 46.6 MW Kaplan turbine-generators. The difference in elevation the water fall and weir provide will afford a hydraulic head of.