The Gordon Dam wall, constructed with of concrete, is long and high, making it the tallest dam in Tasmania and the fifth-tallest in Australia. At 100% capacity the dam wall holds back of water; making Lake Gordon the largest lake in Australia. The surface area of the lake is and the catchment area is. The single controlled spillway is capable of discharging. Approximately 48 arch dams have been built in Australia and only nine have double curvature. Gordon Dam is almost twice the height of the next highest arch dam, Tumut Pondage.
Power station
Water from the dam descends underground into its power station, where three turbines of generate up to of power, covering about 13% of the electricity demand of Tasmania. The first two turbines were commissioned in 1978, before the third was commissioned a decade later in 1988. The power station is fueled by water from Lake Gordon. Water from Lake Pedder is also drawn into Lake Gordon through the McPartlans Pass Canal at.
History
In 1963, the Australian Government provided an 5 million grant to Tasmania's Hydro-Electric Commission to build the Gordon River Road from Maydena into the Gordon River area in the South West Wilderness region. Construction was underway by 1964, and within three years, the Tasmanian State Parliament approved the Gordon River Power Development with little in house opposition in 1967. Power operation began in 1978, a third generator was added in 1988. The completed Gordon Dam was the only dam built on the Gordon River, despite the support of Tasmanian politicians such as Eric Reece, Robin Gray, and others to build the Franklin Dam further downstream. The construction of Gordon Dam resulted in some flooding of the connected Lake Pedder as planned. Subsequent opposition to restore Lake Pedder failed after a Parliamentary inquiry in 1995. The dam was designed with Dr. Sergio Guidici as the chief engineer. He went on to be involved with the design of the Crotty Dam in the West Coast Range, one of the last significant dams created by Hydro Tasmania during its unabated dam-building era. The dam is connected with the Gordon River Power Station, under the surface of the switch yard. In 2015, the Perth-based YouTube channel How Ridiculous broke the world record for the world's highest basketball shot at Gordon dam, though this record has since been surpassed by How Ridiculous themselves twice over.
Due to an extreme drought in 2015 and the untimely failure of the related Basslink power feed, electricity production needs had drained the lake to its minimum operating level in March 2016. The water level fell 45 metres to a record low of six per cent capacity. Pictures document the dramatic effect. After repair of Basslink and record rainfalls, Lake Gordon levels had recovered to -28 metres by January 2017.