The bridge was unpopular with many residents of West End, and with some parents from the West End State school who were concerned about increased traffic and air pollution. The "Stop the Hale Street Bridge Alliance" was formed to voice these concerns. At the start of the bridge's construction two protesters were arrested for allegedly writing graffiti on a wall surrounding the project site.
Construction
Construction began in July 2008 and the project was completed in early July 2010. The bridge was built by The Hale Street Link Alliance which consisted of four companies; Bouygues Travaux Publics, Macmahon Holdings, Seymour Whyte Holdings and Hyder Consulting. During construction, lane closures on Coronation Drive caused delays for motorists and resulted in temporary changes to associated public transport services. The final concrete pour for the main bridge span occurred on 2 December 2009. The construction cost for the bridge was A$338 million.
Bridge structure
The Go Between Bridge is a four-lane bridge with dedicated pedestrian and cycle pathways. It is a three span, twin concrete box girder structure built using balanced cantilever construction. The main bridge span is 117 metres long, supported by two river piers located 74 metres north and 80 metres south of the abutments on each river bank. The pathways are 3.6 metres wide and designed for equitable access. A pedestrian pathway is located on the eastern side of the bridge and a cycleway on the western side. As the Go Between Bridge is steep, the pedestrian path is being built as a separate structure at a lesser grade. This allows for the path gradient to comply with equitable and disabled access requirements.
Naming
A naming competition for the bridge was held through the website , with eleven shortlisted suggestions put to a "popular vote". The winning name was announced on 29 September 2009. Robert Forster, the guitarist for The Go-Betweens, later said, "When Grant and I sat around in 1978 thinking about the things we'd get from being in a rock band, a bridge wasn't one of them. It's not the actual bridge that's so astonishing, it's driving down roads that have those big signs like Ipswich, Gold Coast, and seeing Go Between Bridge. But really nice... and a bridge is a beautiful thing. It's nicer than a Go-Between sewage works."
Toll
Initially the Brisbane City Council planned to recover the cost of the bridge by collecting a toll of $2.70 per vehicle. However, due to budget savings this amount was reduced to $1.50 until the end of 2010, then for the first six months of 2011 it cost $2.00, rising to $2.35 plus CPI from July 2011. The bridge features free-flow tolling with electronic tag and video matching payment options. Transurban has a 50 year lease to toll and operate the bridge. As at 2019 the toll has risen to $3.72 each way including plate matching fee.
Patronage
In July 2010, 9,000 vehicles per day were using the bridge, increasing to 11,725 by mid September 2010. It was expected that this figure would rise to 17,500 by 2011 and in 2021 be 21,000 vehicles. During its first year of operation the bridge collected A$8.18 million from tolls but cost $30 million to operate. During that period the highest number of daily uses was 15,783 on 24 March 2011. Evidence suggests Queenslanders are rejecting the toll roads and seeking other routes. Citizens are also calling out the predatory practices of Transurban rapidly increasing the due amount with additional charges and late penalties, also the Queensland Government enforcing collection of these funds by using the governments own State Penalties Enforcement Registry in order to collect funds for this private company.