Galileo (satellite navigation)


Galileo is a global navigation satellite system that went live in 2016, created by the European Union through the European GNSS Agency, headquartered in Prague, Czech Republic, with two ground operations centers in Fucino, Italy, and Oberpfaffenhofen, Germany. The €10 billion project is named after the Italian astronomer Galileo Galilei. One of the aims of Galileo is to provide an independent high-precision positioning system so European nations do not have to rely on the U.S. GPS, or the Russian GLONASS systems, which could be disabled or degraded by their operators at any time.
The use of basic Galileo services is free and open to everyone. The higher-precision capabilities are available for paying commercial users. Galileo is intended to provide horizontal and vertical position measurements within 1-metre precision, and better positioning services at higher latitudes than other positioning systems.
Galileo is also to provide a new global search and rescue function as part of the MEOSAR system.
The first Galileo test satellite, the GIOVE-A, was launched 28 December 2005, while the first satellite to be part of the operational system was launched on 21 October 2011. As of July 2018, 26 of the planned 30 active satellites are in orbit. Galileo started offering Early Operational Capability on 15 December 2016, providing initial services with a weak signal, and is expected to reach Full Operational Capability in 2019. The complete 30-satellite Galileo system is expected by the end of 2020. It is expected that the next generation of satellites will begin to become operational by 2025 to replace older equipment, which can then be used for backup capabilities.
By early 2020 there were 26 live satellites in the constellation: 22 in usable condition, two satellites are in "testing" and two more not available to users. Out of 22 active satellites, 3 were from the IOV types and 19 of the FOC types. Two test FOC satellites are orbiting the Earth in highly-eccentric orbits whose orientation changes with respect to other Galileo orbital planes. The Galileo system has a greater accuracy than the GPS, Galileo has an accuracy of less than one meter.

History

Main objectives

In 1999, the different concepts of the three main contributors of ESA for Galileo were compared and reduced to one by a joint team of engineers from all three countries. The first stage of the Galileo programme was agreed upon officially on 26 May 2003 by the European Union and the European Space Agency.
The system is intended primarily for civilian use, unlike the more military-oriented systems of the United States, Russia, and China. The European system will only be subject to shutdown for military purposes in extreme circumstances. The countries that contribute most to the Galileo Project are Germany and Italy.

Funding

The European Commission had some difficulty funding the project's next stage, after several allegedly "per annum" sales projection graphs for the project were exposed in November 2001 as "cumulative" projections which for each year projected included all previous years of sales. The attention that was brought to this multibillion-euro growing error in sales forecasts resulted in a general awareness in the Commission and elsewhere that it was unlikely that the program would yield the return on investment that had previously been suggested to investors and decision-makers. On 17 January 2002, a spokesman for the project stated that, as a result of US pressure and economic difficulties, "Galileo is almost dead."
A few months later, however, the situation changed dramatically. European Union member states decided it was important to have a satellite-based positioning and timing infrastructure that the US could not easily turn off in times of political conflict.
The European Union and the European Space Agency agreed in March 2002 to fund the project, pending a review in 2003. The starting cost for the period ending in 2005 is estimated at €1.1 billion. The required satellites were to be launched between 2011 and 2014, with the system up and running and under civilian control from 2019. The final cost is estimated at €3 billion, including the infrastructure on Earth, constructed in 2006 and 2007. The plan was for private companies and investors to invest at least two-thirds of the cost of implementation, with the EU and ESA dividing the remaining cost. The base Open Service is to be available without charge to anyone with a Galileo-compatible receiver, with an encrypted higher-bandwidth improved-precision Commercial Service originally planned to be available at a cost, but in February 2018 the high accuracy service was agreed to be made freely available, with the authentication service remaining commercial. By early 2011 costs for the project had run 50% over initial estimates.

Tension with the United States

Galileo is intended to be an EU civilian GNSS that allows all users access to it. Initially GPS reserved the highest quality signal for military use, and the signal available for civilian use was intentionally degraded. This changed with President Bill Clinton signing a policy directive in 1996 to turn off Selective Availability. Since May 2000 the same precision signal has been provided to both civilians and the military.
Since Galileo was designed to provide the highest possible precision to anyone, the US was concerned that an enemy could use Galileo signals in military strikes against the US and its allies. The frequency initially chosen for Galileo would have made it impossible for the US to block the Galileo signals without also interfering with its own GPS signals. The US did not want to lose their GNSS capability with GPS while denying enemies the use of GNSS. Some US officials became especially concerned when Chinese interest in Galileo was reported.
An anonymous EU official claimed that the US officials implied that they might consider shooting down Galileo satellites in the event of a major conflict in which Galileo was used in attacks against American forces. The EU's stance is that Galileo is a neutral technology, available to all countries and everyone. At first, EU officials did not want to change their original plans for Galileo, but they have since reached the compromise that Galileo is to use different frequencies. This allows the blocking or jamming of either GNSS without affecting the other.

GPS and Galileo

One of the reasons given for developing Galileo as an independent system was that position information from GPS can be made significantly inaccurate by the deliberate application of universal Selective Availability by the US military. GPS is widely used worldwide for civilian applications; Galileo's proponents argued that civil infrastructure, including airplane navigation and landing, should not rely solely upon a system with this vulnerability.
On 2 May 2000, SA was disabled by the President of the United States, Bill Clinton; in late 2001 the entity managing the GPS confirmed that they did not intend to enable selective availability ever again. Though Selective Availability capability still exists, on 19 September 2007 the US Department of Defense announced that newer GPS satellites would not be capable of implementing Selective Availability;
the wave of Block IIF satellites launched in 2009, and all subsequent GPS satellites, are stated not to support SA. As old satellites are replaced in the GPS Block IIIA program, SA will cease to be an option. The modernisation programme also contains standardised features that allow GPS III and Galileo systems to inter-operate, allowing receivers to be developed to utilise GPS and Galileo together to create an even more accurate GNSS.

Cooperation with the United States

In June 2004, in a signed agreement with the United States, the European Union agreed to switch to a binary offset carrier modulation 1.1, or BOC, allowing the coexistence of both GPS and Galileo, and the future combined use of both systems.
The European Union also agreed to address the "mutual concerns related to the protection of allied and US national security capabilities."

First experimental satellites: GIOVE-A and GIOVE-B

The first experimental satellite, GIOVE-A, was launched in December 2005 and was followed by a second test satellite, GIOVE-B, launched in April 2008. After successful completion of the In-Orbit Validation phase, additional satellites were launched. On 30 November 2007 the 27 EU transport ministers involved reached an agreement that Galileo should be operational by 2013, but later press releases suggest it was delayed to 2014.

Funding again, governance issues

In mid-2006 the public/private partnership fell apart, and the European Commission decided to nationalise the Galileo programme.
In early 2007 the EU had yet to decide how to pay for the system and the project was said to be "in deep crisis" due to lack of more public funds. German Transport Minister Wolfgang Tiefensee was particularly doubtful about the consortium's ability to end the infighting at a time when only one testbed satellite had been successfully launched.
Although a decision was yet to be reached, on 13 July 2007 EU countries discussed cutting €548m from the union's competitiveness budget for the following year and shifting some of these funds to other parts of the financing pot, a move that could meet part of the cost of the union's Galileo satellite navigation system. European Union research and development projects could be scrapped to overcome a funding shortfall.
In November 2007, it was agreed to reallocate funds from the EU's agriculture and administration budgets and to soften the tendering process in order to invite more EU companies.
In April 2008, the EU transport ministers approved the Galileo Implementation Regulation. This allowed the €3.4bn to be released from the EU's agriculture and administration budgets to allow the issuing of contracts to start construction of the ground station and the satellites.
In June 2009, the European Court of Auditors published a report, pointing out governance issues, substantial delays and budget overruns that led to project stalling in 2007, leading to further delays and failures.
In October 2009, the European Commission cut the number of satellites definitively planned from 28 to 22, with plans to order the remaining six at a later time. It also announced that the first OS, PRS and SoL signal would be available in 2013, and the CS and SOL some time later. The €3.4 billion budget for the 2006–2013 period was considered insufficient. In 2010 the think-tank Open Europe estimated the total cost of Galileo from start to 20 years after completion at €22.2 billion, borne entirely by taxpayers. Under the original estimates made in 2000, this cost would have been €7.7 billion, with €2.6 billion borne by taxpayers and the rest by private investors.
In November 2009, a ground station for Galileo was inaugurated near Kourou.
The launch of the first four in-orbit validation satellites was planned for the second half of 2011, and the launch of full operational capability satellites was planned to start in late 2012.
In March 2010 it was verified that the budget for Galileo would only be available to provide the 4 IOV and 14 FOC satellites by 2014, with no funds then committed to bring the constellation above this 60% capacity. Paul Verhoef, the satellite navigation program manager at the European Commission, indicated that this limited funding would have serious consequences commenting at one point "To give you an idea, that would mean that for three weeks in the year you will not have satellite navigation" in reference to the proposed 18-vehicle constellation.
In July 2010, the European Commission estimated further delays and additional costs of the project to grow up to €1.5–1.7 billion, and moved the estimated date of completion to 2018. After completion the system will need to be subsidised by governments at €750 million per year. An additional €1.9 billion was planned to be spent bringing the system up to the full complement of 30 satellites.
In December 2010, EU ministers in Brussels voted Prague, in the Czech Republic, as the headquarters of the Galileo project.
In January 2011, infrastructure costs up to 2020 were estimated at €5.3 billion. In that same month, Wikileaks revealed that Berry Smutny, the CEO of the German satellite company OHB-System, said that Galileo "is a stupid idea that primarily serves French interests". The BBC learned in 2011 that €500 million would become available to make the extra purchase, taking Galileo within a few years from 18 operational satellites to 24.
The first two Galileo In-Orbit Validation satellites were launched by Soyuz ST-B flown from Guiana Space Centre on 21 October 2011, and the remaining two on 12 October 2012. As of 2017, the satellites are fully useful for precise positioning and geodesy with a limited usability in navigation.
Twenty-two further satellites with Full Operational Capability were on order as of 2018. The first four pairs of satellites were launched on 22 August 2014, 27 March 2015, 11 September 2015 and 17 December 2015.

Clock failures

In January 2017, news agencies reported that six of the passive hydrogen masers and three of the rubidium atomic clocks had failed. Four of the full operational satellites have each lost at least one clock; but no satellite has lost more than two. The operation has not been affected as each satellite is launched with four clocks. The possibility of a systemic flaw is being considered. SpectraTime, the Swiss producer of both on-board clock types, declined to comment. According to ESA they concluded with their industrial partners for the rubidium atomic clocks that some implemented testing and operational measures were required. Additionally some refurbishment is required for the rubidium atomic clocks that still have to be launched. For the passive hydrogen masers operational measures are being studied to reduce the risk of failure. China and India use the same SpectraTime-built atomic clocks in their satellite navigation systems. ESA has contacted the Indian Space Research Organisation who initially reported not having experienced similar failures. However, at the end of January 2017, Indian news outlets reported that all three clocks aboard the IRNSS-1A satellite had failed and that a replacement satellite would be launched in the second half of 2017, these atomic clocks were said to be supplied under a four-million-euro deal.
In July 2017 the European Commission reported that the main causes of the malfunctions have been identified and measures have been put in place to reduce the possibility of further malfunctions of the satellites already in space. According to European sources ESA took measures to correct both identified sets of problems by replacing a faulty component that can cause a short circuit in the rubidium clocks and improve the passive hydrogen maser clocks as well on satellites still to be launched.

2019 outage

From 11 July till 18 July 2019 the whole constellation experienced an "unexplained" signal outage with all active satellites showing "NOT USABLE" status on Galileo status page. The cause of the incident was an equipment malfunction in the Galileo ground infrastructure that affected the calculation of time and orbit predictions.

International involvement

In September 2003, China joined the Galileo project. China was to invest €230 million in the project over the following years.
In July 2004, Israel signed an agreement with the EU to become a partner in the Galileo project.
On 3 June 2005 the EU and Ukraine signed an agreement for Ukraine to join the project, as noted in a press release.
As of November 2005, Morocco also joined the programme.
In mid-2006, the Public-Private Partnership fell apart and the European Commission decided to nationalise Galileo as an EU programme.
In November 2006, China opted instead to upgrade BeiDou navigation system, its then-regional satellite navigation system. The decision was due to security concerns and issues with Galileo financing.
On 30 November 2007, the 27 member states of the European Union unanimously agreed to move forward with the project, with plans for bases in Germany and Italy. Spain did not approve during the initial vote, but approved it later that day. This greatly improved the viability of the Galileo project: "The EU's executive had previously said that if agreement was not reached by January 2008, the long-troubled project would essentially be dead."
On 3 April 2009, Norway too joined the programme pledging €68.9 million toward development costs and allowing its companies to bid for the construction contracts. Norway, while not a member of the EU, is a member of ESA.
On 18 December 2013, Switzerland signed a cooperation agreement to fully participate in the program, and retroactively contributed €80 million for the period 2008–2013. As a member of ESA, it already collaborated in the development of the Galileo satellites, contributing the state-of-the-art hydrogen-maser clocks. Switzerland's financial commitment for the period 2014–2020 will be calculated in accordance with the standard formula applied for the Swiss participation in the EU research Framework Programme.
In March 2018, the European Commission announced that the United Kingdom may be excluded from parts of the project following its exit from the European Union. As a result, Airbus plans to relocate work on the Ground Control Segment from its Portsmouth premises to an EU state. British officials have been reported to be seeking legal advice on whether they can reclaim the €1.4 billion invested by the United Kingdom, of the €10 billion spent to date. In a speech at the EU Institute for Security Studies conference, the EU Chief Negotiator in charge of the Brexit negotiations, Michel Barnier, stressed the EU position that the UK had decided to leave the EU and thus all EU programmes, including Galileo. In August 2018, it was reported the UK will look to create a competing satellite navigation system to Galileo post-Brexit. In December 2018, British Prime Minister Theresa May announced that the UK would no longer seek to reclaim the investment, and Science Minister Sam Gyimah resigned over the matter.

System description

Space segment

As of 2012, the system was scheduled to have 15 satellites operational in 2015 and reach full operation in 2020 with the following specifications:
The system's orbit and signal accuracy is controlled by a ground segment consisting of:
The system transmits three signals: E1, E5 consisting of E5a and E5b, and E6 :
ParametersE1-IE1-QE5aE5bE6-IE6-Q
Carrier frequency, MHz1575.421575.421176.451207.141278.751278.75
ModulationCBOCBOCcosAltBOCAltBOCBPSKBOCcos

Services

The Galileo system will have four main services:
; Open Service :This will be available without charge for use by anyone with appropriate mass-market equipment; simple timing, and positioning down to one metre.
;High Accuracy Service : Accuracy to one centimetre free of charge.
; Public Regulated Service : Designed to be more robust, with anti-jamming mechanisms and reliable problem detection. Limited to authorized governmental bodies.
; Search and Rescue Service : System will pick up distress beacon locations; feasible to send feedback, e.g. confirming help is on its way.
The former Safety of Life service is being re-profiled and it will probably be up to the receiver to assess the integrity of the signal.
All above services are expected to provide Navigation Message Authentication to prevent GNSS spoofing attacks using Open Service Navigation Message Authentication specification published in 2016. The service uses TESLA cryptographic algorithm and is expected to be available from 2020.

Concept

Each Galileo satellite has two master passive hydrogen maser atomic clocks and two secondary rubidium atomic clocks which are independent of one other. As precise and stable space-qualified atomic clocks are critical components to any satellite-navigation system, the employed quadruple redundancy keeps Galileo functioning when onboard atomic clocks fail in space. The onboard passive hydrogen maser clocks' precision is four times better than the onboard rubidium atomic clocks and estimated at 1 second per 3 million years, and will provide an accurate timing signal to allow a receiver to calculate the time that it takes the signal to reach it. The Galileo satellites are configured to run one hydrogen maser clock in primary mode and a rubidium clock as hot backup. Under normal conditions, the operating hydrogen maser clock produces the reference frequency from which the navigation signal is generated. Should the hydrogen maser encounter any problem, an instantaneous switchover to the rubidium clock would be performed. In case of a failure of the primary hydrogen maser the secondary hydrogen maser could be activated by the ground segment to take over within a period of days as part of the redundant system. A clock monitoring and control unit provides the interface between the four clocks and the navigation signal generator unit. It passes the signal from the active hydrogen master clock to the NSU and also ensures that the frequencies produced by the master clock and the active spare are in phase, so that the spare can take over instantly should the master clock fail. The NSU information is used to calculate the position of the receiver by trilaterating the difference in received signals from multiple satellites.
The onboard passive hydrogen maser and rubidium clocks are very stable over a few hours. If they were left to run indefinitely, though, their timekeeping would drift, so they need to be synchronized regularly with a network of even more stable ground-based reference clocks. These include active hydrogen maser clocks and clocks based on the caesium frequency standard, which show a far better medium and long-term stability than rubidium or passive hydrogen maser clocks. These clocks on the ground are gathered together within the parallel functioning Precise Timing Facilities in the Fucino and Oberpfaffenhofen Galileo Control Centres. The ground based clocks also generate a worldwide time reference called Galileo System Time, the standard for the Galileo system and are routinely compared to the local realizations of UTC, the UTC of the European frequency and time laboratories.
For more information of the concept of global satellite navigation systems, see GNSS and GNSS positioning calculation.

European GNSS Service Centre

The European GNSS Service Centre, located in Madrid, is an integral part of Galileo and provides the single interface between the Galileo system and Galileo users. GSC publishes Galileo official documentation, promotes Galileo current and future services worldwide, supports standardization and distributes Galileo almanacs, ephemeris and metadata.
The GSC User Helpdesk is the point of contact for Galileo user's assistance.  GSC answers queries and gathers incident notifications from users on Galileo. The helpdesk is continuously available for all worldwide Galileo users through the GSC web portal.
GSC provides updated Galileo constellation status and informs on planned and unplanned events through Notice Advisory to Galileo Users. GSC publishes Galileo reference documentation and general information on Galileo services and signals description and Galileo performance reports.

Search and rescue

Galileo is to provide a new global search and rescue function as part of the MEOSAR system. Satellites will be equipped with a transponder which will relay distress signals from emergency beacons to the Rescue coordination centre, which will then initiate a rescue operation. At the same time, the system is projected to provide a signal, the Return Link Message, to the emergency beacon, informing them that their situation has been detected and help is on the way. This latter feature is new and is considered a major upgrade compared to the existing Cospas-Sarsat system, which does not provide feedback to the user. Tests in February 2014 found that for Galileo's search and rescue function, operating as part of the existing International Cospas-Sarsat Programme, 77% of simulated distress locations can be pinpointed within 2 km, and 95% within 5 km.
Galileo Return Link Service which allows acknowledgement of distress messages received through the constellation went live in January 2020.

Constellation

Galileo satellite test beds: GIOVE

In 2004 the Galileo System Test Bed Version 1 project validated the on-ground algorithms for Orbit Determination and Time Synchronisation. This project, led by ESA and European Satellite Navigation Industries, has provided industry with fundamental knowledge to develop the mission segment of the Galileo positioning system.
A third satellite, GIOVE-A2, was originally planned to be built by SSTL for launch in the second half of 2008. Construction of GIOVE-A2 was terminated due to the successful launch and in-orbit operation of GIOVE-B.
The GIOVE Mission segment operated by European Satellite Navigation Industries used the GIOVE-A/B satellites to provide experimental results based on real data to be used for risk mitigation for the IOV satellites that followed on from the testbeds. ESA organised the global network of ground stations to collect the measurements of GIOVE-A/B with the use of the GETR receivers for further systematic study. GETR receivers are supplied by Septentrio as well as the first Galileo navigation receivers to be used to test the functioning of the system at further stages of its deployment. Signal analysis of GIOVE-A/B data confirmed successful operation of all the Galileo signals with the tracking performance as expected.

In-Orbit Validation (IOV) satellites

These testbed satellites were followed by four IOV Galileo satellites that are much closer to the final Galileo satellite design. The Search & Rescue feature is also installed. The first two satellites were launched on 21 October 2011 from Guiana Space Centre using a Soyuz launcher, the other two on 12 October 2012. This enables key validation tests, since earth-based receivers such as those in cars and phones need to "see" a minimum of four satellites in order to calculate their position in three dimensions. Those 4 IOV Galileo satellites were constructed by Astrium GmbH and Thales Alenia Space. On 12 March 2013, a first fix was performed using those four IOV satellites. Once this In-Orbit Validation phase has been completed, the remaining satellites will be installed to reach the Full Operational Capability.

Full Operational Capability (FOC) satellites

On 7 January 2010, it was announced that the contract to build the first 14 FOC satellites was awarded to OHB System and Surrey Satellite Technology Limited.
Fourteen satellites will be built at a cost of €566M.
Arianespace will launch the satellites for a cost of €397M.
The European Commission also announced that the €85 million contract for system support covering industrial services required by ESA for integration and validation of the Galileo system had been awarded to Thales Alenia Space. Thales Alenia Space subcontract performances to Astrium GmbH and security to Thales Communications.
In February 2012, an additional order of eight satellites was awarded to OHB Systems for €250M, after outbidding EADS Astrium tender offer. Thus bringing the total to 22 FOC satellites.
On 7 May 2014, the first two FOC satellites landed in Guyana for their joint launch planned in summer Originally planned for launch during 2013, problems tooling and establishing the production line for assembly led to a delay of a year in serial production of Galileo satellites. These two satellites were launched on 22 August 2014. The names of these satellites are Doresa and Milena named after European children who had previously won a drawing contest. On 23 August 2014, launch service provider Arianespace announced that the flight VS09 experienced an anomaly and the satellites were injected into an incorrect orbit. They ended up in elliptical orbits and thus could not be used for navigation. However, it was later possible to use them to perform a physics experiment, so they were not a complete loss.
Satellites GSAT-203 and GSAT-204 were launched successfully on 27 March 2015 from Guiana Space Centre using a Soyuz four stage launcher. Using the same Soyuz launcher and launchpad, satellites GSAT-205 and GSAT-206 were launched successfully on 11 September 2015.
Satellites GSAT-208 and GSAT-209 were successfully launched from Kourou, French Guiana, using the Soyuz launcher on 17 December 2015.
Satellites GSAT-210 and GSAT-211 were launched on 24 May 2016.
Starting in November 2016, deployment of the last twelve satellites will use a modified Ariane 5 launcher, named Ariane 5 ES, capable of placing four Galileo satellites into orbit per launch.
Satellites GSAT-207, GSAT-212, GSAT-213, GSAT-214 were successfully launched from Kourou, French Guiana, on 17 November 2016 on an Ariane 5 ES.
On 15 December 2016, Galileo started offering Initial Operational Capability. The services currently offered are Open Service, Public Regulated Service and Search and Rescue Service.
Satellites GSAT-215, GSAT-216, GSAT-217, GSAT-218 were successfully launched from Kourou, French Guiana, on 12 December 2017 on an Ariane 5 ES.
Satellites GSAT-219, GSAT-220, GSAT-221, GSAT-222 were successfully launched from Kourou, French Guiana, on 25 July 2018 on an Ariane 5 ES.

Second generation (G2G) satellites

As of 2014, ESA and its industry partners have begun studies on Galileo Second Generation satellites, which will be presented to the EC for the late 2020s launch period. One idea is to employ electric propulsion, which would eliminate the need for an upper stage during launch and allow satellites from a single batch to be inserted into more than one orbital plane. The new generation satellites are expected to be available by 2025. and serve to augment the existing network.

Applications and impact

Science projects using Galileo

In July 2006 an international consortium of universities and research institutions embarked on a study of potential scientific applications of the Galileo constellation. This project, named GEO6, is a broad study oriented to the general scientific community, aiming to define and implement new applications of Galileo.
Among the various GNSS users identified by the Galileo Joint Undertaking, the GEO6, project addresses the Scientific User Community.
The GEO6 project aims at fostering possible novel applications within the scientific UC of GNSS signals, and particularly of Galileo.
The AGILE project is an EU-funded project devoted to the study of the technical and commercial aspects of location-based services. It includes technical analysis of the benefits brought by Galileo and studies the hybridisation of Galileo with other positioning technologies. Within these projects, some pilot prototypes were implemented and demonstrated.
On the basis of the potential number of users, potential revenues for Galileo Operating Company or Concessionaire, international relevance, and level of innovation, a set of Priority Applications will be selected by the consortium and developed within the time-frame of the same project.
These applications will help to increase and optimise the use of the EGNOS services and the opportunities offered by the Galileo Signal Test-Bed and the Galileo phase.

Receivers

All major GNSS receiver chips support Galileo and hundreds of end-user devices are compatible with Galileo. The first, dual-frequency-GNSS-capable Android devices, which track more than one radio signal from each satellite, E1 and E5a frequencies for Galileo, were the Huawei Mate 20 line, Xiaomi Mi 8, Xiaomi Mi 9 and Xiaomi Mi MIX 3., there were more than 140 Galileo-enabled smartphones on the market of which 9 were dual-frequency enabled. On 24 December 2018, the European Commission passed a mandate for all new smartphones to implement Galileo for E112 support.
Effective 1 April 2018, all new vehicles sold in Europe must support eCall, an automatic emergency response system that dials 112 and transmits Galileo location data in the event of an accident.
Until late 2018, Galileo was not authorized for use in the United States, and as such, only variably worked on devices that could receive Galileo signals, within United States territory. The Federal Communications Commission's position on the matter was that non-GPS radio navigation satellite systems receivers must be granted a license to receive said signals. A waiver of this requirement for Galileo was requested by the EU and submitted in 2015, and on 6 January 2017, public comment on the matter was requested. On 15 November 2018, the FCC granted the requested waiver, explicitly allowing non-federal consumer devices to access Galileo E1 and E5 frequencies. However, most devices, including smartphones still require operating system updates or similar updates to allow the use of Galileo signals within the United States.

Coins

The European Satellite Navigation project was selected as the main motif of a very high-value collectors' coin: the Austrian European Satellite Navigation commemorative coin, minted on 1 March 2006. The coin has a silver ring and gold-brown niobium "pill". In the reverse, the niobium portion depicts navigation satellites orbiting the Earth. The ring shows different modes of transport, for which satellite navigation was developed: an airplane, a car, a lorry, a train and a container ship.

Competing systems