The Fruitvale Bridge and the Fruitvale Avenue Bridge are parallel bridges that cross the Oakland Estuary, linking the cities of Oakland and Alameda in California. The Fruitvale Bridge is a vertical-lift railroad moveable bridge, while the Fruitvale Avenue Bridge is a roadbascule bridge that connects Fruitvale Avenue in Oakland with Tilden Avenue in Alameda.
Rail bridge
The rail bridge is immediately west of the Miller-Sweeney road bridge. The rail bridge connected Fruitvale Avenue in Oakland with Tilden Way in Alameda. It has been out of service since 2000.
The right-of-way still exists through the East Bay, however, the tracks on both sides of the bridge have been severed and the span remains raised at 65 feet above water level, except when operated for maintenance and testing. The bridge is owned by the U.S. Army Corps of Engineers and is operated by the County of Alameda. The Miller-Sweeney bridge tender, a county employee, operates the railroad bridge from controls in the Miller-Sweeney control house. The last train across the bridge ran in 2000.
Road bridge
The road bridge is officially named the Miller-Sweeney Bridge at Fruitvale Avenue. It has no overhead steel structure like the other road bridges between Alameda and Oakland so tall vehicles should use the Miller-Sweeney Bridge. Miller-Sweeney opens approximately 1,600 times per year to accommodate marine traffic.
History
A bridge at this location initially opened in 1894, initially carrying rail traffic. It was regraded to accommodate road traffic, and the train tracks were removed in 1951 with the completion of the dedicated vertical-lift rail bridge. The present Miller-Sweeney Bridge was completed in 1973 by the US Army Corps of Engineers and turned over to Alameda County in 1975. Miller-Sweeney won a prize bridge award for movable spans from the American Institute of Steel Construction in 1974. The Miller-Sweeney Bridge was damaged in the 1989 Loma Prieta earthquake and was damaged again in 1991 when a fully loaded barge hit the span.
Design
The Miller-Sweeney Bridge is normally opened by two motors, which take 66 seconds to fully open the bridge to 79°. The motors typically operate in tandem, drawing electricity from Alameda Municipal Power. Under emergency conditions, a portable generator may be used to power the single backup motor, which takes 20 minutes to fully open the bridge.