FARICE-1
FARICE-1 is a submarine communications cable connecting Iceland, the Faroe Islands and Scotland. The cable has been in use since January 2004 without a fault and is 100% owned by the Icelandic state. The cable had an initial design capacity of 720 Gbit/s and is a two fibre pair design. The length of the cable is 1205 km for the direct route between Iceland and Scotland. The cable structure and repeaters were made by Pirelli and the terminal equipment was supplied by TYCO. In the year 2013 the terminal equipment was bringing the total capacity of the submarine cable to 11 Tbit/s. The cable has service access points in Reykjavik and as well as in London Telehouse East. The company Farice ehf sells services over the FARICE-1 cable. FARICE-2 was never built. DANICE is the complementary submarine cable.
The landing points are: