Expressway S12 (Poland)
Expressway S12 or express road S12 is a major road in Poland which has been planned to run from Piotrków Trybunalski, through Radom, Lublin and Chełm, to the border crossing with Ukraine at Dorohusk. The completed road should be about long. As of Summer 2018 the portion open to traffic runs from Puławy to Lublin.Sections of the Expressway
A document outlining the future development of transport infrastructure issued by the Polish government in August 2014 projected that the road would be fully completed in 2023. The section forming the bypass of Chełm will probably be built first.