European Marine Energy Centre


The European Marine Energy Centre Ltd is a UKAS accredited test and research centre focusing on wave and tidal power development based in the Orkney Islands, UK. The Centre provides developers with the opportunity to test full-scale grid-connected prototype devices in unrivalled wave and tidal conditions. The operations are spread over five sites:
EMEC was established by a grouping of public sector organisations following a recommendation by the House of Commons Science and Technology Committee in 2001. In addition to providing access to areas of sea with high wave and tidal energy potential, the centre also offers various kinds of support regarding regulatory issues, grid connection and meteorological monitoring as well as local research and engineering support.

Wave power testing at EMEC

EMEC’s wave test facility is situated on the western edge of the Orkney mainland, in an area with one of the highest wave energy potentials in Europe. The exposed North Sea location means the island group is subjected to the powerful dynamic forces of the North Atlantic Ocean, with the highest wave recorded by EMEC reaching over 18 metres. Construction of the wave test facility was completed in October 2003, and operational activities commenced shortly thereafter. The centre's facilities consist of five cabled test berths, ranging from 50-70m water depth off Billia Croo, Stromness on the Orkney mainland and two shallow water berths situated close to EMEC's onshore substation.
The following technologies have been installed and tested at the Billia Croo wave test site so far:
For the most up-to-date information regarding technologies testing at EMEC, visit: and

Tidal power testing at EMEC

The tidal power test site at the Fall of Warness, to the west of the island of Eday, was chosen for its high velocity marine currents which reach almost 4 m/s at spring tides. The facility offers seven test berths at depths ranging from 25 m to 50 m in an area 2 km across and approximately 4 km in length.
From each developer berth, the subsea cables follow back along the seabed and then pass under the beach and into an onshore substation. An adjacent laydown area then provides an optional area for developers to use conditioning equipment for converting from the level at which they generate to grid compliant electricity.
The substation building has four separate areas: the HV switchroom, communications room, personnel room and the standby generator room.
site.
The test site was officially opened by Scotland's First Minister in September 2007.
The following tidal developers have installed and tested technologies at EMEC's Fall of Warness tidal test site:
For the most up-to-date information regarding technologies testing at EMEC, visit: and

Non-grid connected test sites

EMEC has also worked hard to ease the path to market for marine renewable developers by developing test sites in less challenging conditions, helping to close the gap between testing in a wave or tidal tank and bringing full-scale prototypes to trial in real sea conditions.
These non-grid connected test sites - situated at Shapinsay Sound and Scapa Flow - provide a more flexible sea space for use by smaller scale technologies, supply chain companies, and equipment manufacturers. Such accessible real sea testing enables marine energy developers and suppliers to learn lessons more cheaply by reducing the need for big vessels or large plant.
At these sites multi-point anchoring systems provide developers with a fully functional alternative to either bringing their own gravity base or having to drill and install anchor chains and mooring blocks. Bespoke test support buoys allow developers to dissipate the electricity generated by their devices in an environmentally conscious way, while transferring wave and tidal data back to the control centre. An area of seabed is also available for rehearsal of deployment techniques.
Technologies that have tested at EMEC's non-grid connected sites include:
*
*
*
For the most up-to-date information regarding technologies testing at EMEC, visit: and

Performance Assessment

EMEC is accredited to test laboratory standards and can test the performance of wave and tidal energy devices against IEC Technical Specifications.

Technical Verification

EMEC can provide independent verification in accordance with ISO 17020 to confirm that a wave energy converter satisfies its conceptual reliability, survivability and performance targets. With proof of performance credibly assured, you can reduce the technological risk for technology purchasers, helping to attract investment and increase your market share.

Environmental Technology Verification

In 2014, EMEC expanded its scope attaining the International Standard ISO/IEC 17020 for verification of the performance of new environmental technologies. Open to energy technologies, water treatment and monitoring technologies, and materials, waste and resources, EMEC-ETV can help innovative technologies reach the market via the provision of a Statement of Verification.

Marine industry standards

EMEC has coordinated the development of a suite of standards on behalf of the marine renewable energy industry. Each document has been progressed by a working group with individuals representing technology developers, regulators, academia, utilities, and project developers - a true cross-section of the marine energy industry. These standards were launched in 2009 and are available free for download from the EMEC website: .
In March 2014, EMEC, in collaboration with the Offshore Renewable Energy Catapult, facilitated a workshop to review the existing suite of EMEC standards and identify areas where new standards require to be developed. The report from the workshop is available to download here:

Research and monitoring

For most developers coming to deploy at EMEC, installation at these facilities will be the first time their device has been in the open sea and grid connected. They typically will not have a track record which indicates the type and extent of interactions between the device and the receiving environment. Therefore, whilst the central purpose of EMEC is to provide an operational test facility, there is also a key role in establishing and facilitating monitoring of devices in relation to their impacts on the receiving environment. The main driver to this has been through the consenting process, which requires developers to consider environmental issues prior to testing at EMEC and to mitigate against any potential for negative impact.
The involvement within the research field has led EMEC to occupy a unique position, having links with a range of different developers and devices, as well as academic institutions and regulatory bodies. EMEC is independent of any developer or device, as EMEC aims to ensure that different devices are monitored in a consistent way, using the best available methods. Independence of EMEC also encourages the dissemination of monitoring information can be carried out throughout the industry.

Power Purchase Agreement

has signed a Power Purchase Agreement with the EMEC, for the power generated from their wave and tidal devices in the Orkney Islands.