Electricity sector in Ghana
generates electric power from hydropower, fossil-fuel, and renewable energy sources. Electricity generation is one of the key factors in order to achieve the development of the Ghanaian national economy, with aggressive and rapid industrialisation; Ghana's national electric energy consumption was 265 kilowatt hours per capita in 2009.
Ghana exports some of its generated energy and fossil fuels to other countries. Electricity transmission is under the operations of Ghana Grid Company. The distribution of electricity is under Northern Electricity Distribution Company and Electricity Company of Ghana.
History
The first Ghana government-sponsored public electricity supply in Ghana commenced in the year 1914 at Sekondi-Takoradi, operated by the Ghana Railway Administration. Power supply was extended to Sekondi-Takoradi in 1928. The Ghana Public Works Department had commenced a limited direct current supply in Accra during 1922. A large alternating current project started on 1 November 1924, and a small plant consisting of three horizontal single cylinder oil-powered engines was installed in Koforidua in 1925.In 1926, work started on electrical distribution to Kumasi. A restricted evening supply commenced in May 1927, and a power station was brought into full operation on 1 October 1927. In the same year DC supply was installed at Winneba but this was subsequently changed to AC by extending an existing supply from Swedru and during the period 1929-30, a limited electricity supply was extended to Tamale until a new AC plant was installed in 1938.
The next power station to be established was Cape Coast in 1932. This was taken over by the Ghana Electricity Department in 1947. A Ghanaian power station at Swedru was commissioned in 1948 and this was followed by the installation of generating plants at Akim Oda, Dunkwa-on-Offin and Bolgatanga in 1948. On 27 May 1949, an electricity supply was made available at Nsawam through the building of an 11 kV overhead transmission line from Accra. The Keta electricity supply which was included in the programme was delayed by staff difficulties and was not commissioned until 1955.
The Tema power station was commissioned in 1956 with a 3 x diesel generating set. The Ho power station followed in 1957 and from 1961-64. The Tema power station was extended to a maximum capacity of, thus, making it probably the biggest single diesel-powered generating station in Africa.
In 1963 the Ghana Electricity Division brought into operation the first 161 kV transmission system in Ghana, which was used to carry power from the Tema Power Station. At its peak in 1965, about 75 percent of the power was used in Accra.
In 1994, Ghana's total generating capacity was about 1.187GW, and annual production totaled approximately 4.49GW. The main source of supply was the Volta River Authority with six 127MW turbines installed at the Akosombo Hydroelectric Project. At this time, this project provided the bulk of all electricity consumed in Ghana, some 60 percent of which was purchased by Volta Aluminum Company for its smelter. The power plant export amounted to an estimated equivalent of 180,000 tons of oil in 1991.
The balance of Ghana's electricity was produced by diesel units owned by the Electricity Corporation of Ghana, by mining companies, and by a 160MW hydroelectric plant at Kpong, about 40 kilometers downstream from Akosombo. A third dam at Bui on the Black Volta River had been studied, and was completed in 2013.
Other sites with the potential for power generation, on the Pra River, the Tano River, the White Volta River, and the Ankobra River, would also require substantial investment.
Ghana has attempted to increase distribution of its electricity throughout the country. One program Ghana has initiated will provide reliable and widespread electricity in the urban and southern parts of the country. In addition, the extension of the national grid to the Northern Region was commissioned in 1989. The extension links northern Ghana to the power generated from the Akosombo Dam.
was built on the Volta river in 1965 and is spilling water through six floodgates because of the all-time high water level in the Akosombo Dam.
The second phase of the extension will connect major towns in Upper East Region with the regional capital, Bolgatanga, at a cost of US$100 million. The final phase will see exports of electricity across the northern national border of Ghana to Burkina-Faso. In early 1991 the Electricity Corporation of Ghana began the expansion of electricity networks in the northwestern areas of Accra and the Ghanaian corporation aimed to extend the supply of electricity to all isolated centers in Ghana where diesel is the main source of power. Plans were also afoot to increase the supply of electricity by utilisation of thermal energy and construction was anticipated by late 1994 on the country's first thermal power generating plant near Sekondi-Takoradi and scheduled for completion in 1997, the plant contributed 300MW of electricity to the Ghana national grid.
Since 2007, Ghana has become an electricity exporter and since 2011 an exporter of crude oil, and natural gas, and a generator of electricity by thermal energy, hydropower, solar energy and renewable energies since 2012.
Fossil fuel
Crude oil and Natural gas production
Ghana produces 140–200 million cubic feet of natural gas per day and in which natural gas production in Ghana has been restrained from full production capacity since December 2012, due to delays in construction of a Ghanaian gas refinery in Sekondi-Takoradi that was scheduled to be completed by December 2012 and now scheduled to be completed by December 2013, and due to which in turn has led to gas flaring and Ghana losing hundreds of millions a day since December 2012 in revenues from natural gas production. Since December 2012 billions of dollars a year have been lost from the Ghanaian GDP due to the delays in construction of a gas refinery in Sekondi-Takoradi.A Ghanaian oilfield which is reported to contain up to of crude oil was discovered in 2007, and according to the Ghanaian government, the country could expand its petroleum reserves up to of crude oil in reserves within a few years.
Ghana produces 200,000 barrels of crude oil per day on average from an expected 1–2 million barrels of crude oil per day, and an expected crude oil production revenue of US$ 30 billion a year; as with Angola, also a crude oil producer, has an expected 2 million barrels of crude oil production per day and receives an expected $33.7 billion a year in crude oil revenues.
Tremendous inflow of economic capital from fossil fuel into the Ghanaian economy began from the first quarter of 2011 when Ghana started producing crude oil and natural gas in commercial quantities and the Ghana crude oil industry accounted for 6% of the Ghanaian economic revenue for 2011. Oil and Gas exploration in Ghana continues and the amount of both crude oil and natural gas in Ghana continues to increase.
Solar energy
The biggest photovoltaic and the largest solar energy plant in Africa, the Nzema project, based in Ghana, will be able to provide electricity to more than 100,000 homes. The 155MW plant will increase Ghana's electricity generating capacity by 6%.Construction work on the GH¢ 740 million and the 4th largest solar power plant in the world, is being developed by Blue Energy, a UK-based renewable energy investment company, majority owned and funded by members of the, Stadium Group, a large European private asset and development company with GB£ 2.5 billion under management. Project director is Douglas Coleman, from Mere Power Nzema Ltd, Ghana.
Unlike many other solar projects in Africa that use concentrated solar power, solar plants will use photovoltaic technology to convert sunlight directly into electricity. Installation of more than 630,000 solar PV modules will begin by the end of 2017.
As of August 2015, the project is still under development.
Wind energy
In addition to hydropower and solar energy, Ghana also produces a lot of other renewable energy, other forms of energy that produce electricity in Ghana are wind power, geothermal and biomass. It is the official goal of Ghana energy industry to have 10% of Ghana's energy mix come from renewable sources by 2015, or at the very latest by 2020.Ghana has Class 4-6 wind resources and locations of the high wind areas – such as Nkwanta, the Accra Plains, and Kwahu and Gambaga mountains. The maximum energy that could be tapped from Ghana's available wind resource for electricity is estimated to be about 500 – 600 GWh/year. To give perspective – In 2011, from the same Energy Commission, the largest Akosombo hydroelectric dam in Ghana alone produced 6,495 GWhrs of electric power and, counting all Ghana's geothermal energy production in addition, total energy generated was 11,200 GWhrs in the same year.
These assessments do not take into consideration further limiting factors such as land-use restrictions, the existing grid and accessibility. Wind energy has the potential to contribute significantly to the country's energy industry – 10% can certainly be attained in terms of installed capacity, and about 5% of total electric generation potential from wind alone.
Bio energy
Ghana has put in place mechanisms to attract investments into its biomass and bio-energy sectors to stimulate rural development, create jobs and save foreign exchange.The vast arable and degraded land mass of Ghana has the potential for the cultivation of crops and plants that could be converted into a wide range of solid and liquid bio-fuels, as the development of alternative transportation fuels could help Ghana to diversify and secure its future energy supplies. Main investments in the bio-energy subsector existed in the areas of production, are transportation, storage, distribution, sale, marketing and exportation.
The goal of Ghana regarding bio-energy, as articulated its energy sector policy, is to modernise and examine the benefits of bio-energy on a sustainable basis. Biomass is Ghana's dominant energy resource in terms of endowment and consumption, with the two primary bio-fuels consumed being ethanol and biodiesel. To that effect, the Ghana ministry of Energy in 2010 developed the energy sector strategy and development plan. Highlights of the key policy objectives strategy for the renewable energy subsector include sustaining the supply and efficient use of wood-fuels while ensuring that their utilisation does not lead to deforestation.
The plan would support private sector investments in the cultivation of bio-fuel feedstock, extraction of bio-oil and its refining into secondary products, thereby creating appropriate financial and tax incentives. The Ghana Renewal Energy Act provides the necessary fiscal incentives for renewable energy development by the private sector, and also details the control and management of bio-fuel and wood- fuel projects in Ghana. The Ghana National Petroleum Authority was tasked by the Renewable Energy Act 2011 to price Ghana's bio-fuel blend in accordance with the prescribed petroleum pricing formula.
The combined effects of climate change and global economic turbulence, had triggered a sense of urgency among Ghanaian policymakers, industry and development practitioners to find sustainable and viable solutions in the area of bio-fuels.
Currently, Brazil, which makes ethanol from maize and sugarcane, is the world's largest bio-fuel market.