El Salvador is the largest producer of geothermal energy in Central America. Except for hydroelectric generation, which is almost totally owned and operated by the public company CEL, the rest of the generation capacity is in private hands. With demand expected to grow at a rate of 5% in the coming years, the Government's 2007 National Energy Strategy identified several hydroelectric and geothermal projects as the best option to meet demand in the future and to diversify the country's energy mix.
This would also reduce the dependence on traditional thermal sources and, with that, the vulnerability to high oil prices that the country started to face in 2005. El Salvador is also one of the countries included in the SIEPAC project, which will integrate the electricity network of the country with the rest of the Central American region.

Electricity supply and demand

Installed capacity

El Salvador is the country with the highest geothermal energy production in Central America. Total installed capacity in 2006 was 1,312 MW, of which 52% was thermal, 36% hydroelectric and 12% geothermal. The largest share of generation capacity was in private hands. In terms of evolution, installed capacity has almost doubled in the last 20 years and increased by 200 MW since the year 2000.
Gross electricity generation in 2006 was 5,195 GWh, of which 40% came from traditional thermal sources, 38% from hydroelectricity, 20% from geothermal sources, and 2% from biomass.

Demand

In 2006, total electricity sold in El Salvador was 4,794 GWh, which corresponds to 702kWh annual per capita consumption. The residential sector accounted for 33% of the consumption, with the unregulated market making up for 11% of the electricity consumed.
Maximum demand in the wholesale electricity market was 881 MW, 6.3% higher than the figure for 2005.

Demand versus supply

Increase in maximum demand since the year 2000 has been matched by similar increases in installed capacity. Average annual increase in maximum demand has been 2.6%, while average increase in installed capacity has been 2.9%, with increase percentages above 6% for both measures for the year 2006. The nominal reserve margin for the system in 2004 was 36%. Although high, this number does not capture the vulnerability of the generation system to particular unit outages, especially those related to hydroelectric capacity and availability.
As for the future, demand is expected to grow at an annual rate of 5% in the coming years. Peak demand is expected to grow from 833 MW in 2005 to 1,030 MW in 2010. Planning simulations indicate that the risk of power rationing is unlikely to occur until 2010 even if there is a delay in the commissioning of the SIEPAC interconnection. The 2007 National Energy Strategy identifies the geothermal and hydroelectric projects more likely to be executed in order to close the gap between demand and supply in the future and to meet the objective of diversifying the country's energy mix.

Access to electricity

In 1995, only 65.5% of the population in El Salvador had access to electricity. Currently, the electrification index is 83.4%. This coverage is higher than that in Guatemala, Honduras and Nicaragua but lower than the one for Costa Rica and Panamá and also below the 94.6 average for LAC. Electrification in most major urban centers is estimated to be above 97%, whereas rural coverage is around 72%. The Ministry of Economy's plans seek to reach a 93% rural electrification index by 2009. This ambitious plan includes the expansion of the distribution network as well as the installation of photovoltaic solar panels in areas that are isolated from the network.

Service quality

Interruption frequency and duration

In 2005, the average number of interruptions per subscriber was 12, while duration of interruptions per subscriber was 16 hours. This is very close to the weighted averages for LAC, which are 13 interruptions and 14 hours respectively.

Distribution and transmission losses

In 2006, distribution losses in El Salvador were 12.4%, only higher than those of Costa Rica and below the regional Central American average of 16.2%. On the other hand, transmission losses were as low as 1.7% for the same year.

Responsibilities in the electricity sector

Policy and regulation

The regulatory entities for the electricity sector in El Salvador are:
In 2006, the President created the National Energy Council, which has the role of analyzing El Salvador's energy situation as well as the Government proposals, recommending the inclusion of new actions and strategies. The CNE seeks to contribute to a shift in generation towards renewable energy and to modify consumption patterns toward the efficient use of energy.
The Transactions Unit is the private company in charge of administering the wholesale electricity market, being in charge of system dispatch and performing clearing-house functions. UT is also responsible for the operation of the transmission system.

Generation

In 2006, there were 11 generation companies in El Salvador. Of the 22 generating plants, 18 were in private hands. The only public company with a stake in generation is CEL, which owns 97% of the hydroelectric capacity. The number and type of plants operated by each company is as follows:
TypeCompany nameNo. of plantsInstalled capacity
WHOLESALE MARKET131,157.3
Public companies4460.3
Hydroelectric4460.3
CEL4460.3
Private companies9697
Geothermal2151.2
LaGeo2151.2
Thermal7545.8
CESSA132.6
CLESA10
Duke3318
Invers.Ene151.2
Nejapa1144
RETAIL MARKET9155.5
Private companies9155.5
Hydroelectric312.3
CECSA18
De Matheu11.5
Sensunapán12.8
Thermal6143.2
Borealis113.6
CASSA129
EGI Holdco15.5
Ing. Cabaña121
Ing. Ángel130
Textufil144.1
TOTAL221,312.8

Source: CEPAL 2007

Transmission

In El Salvador, one government-owned company, Etesal, which was constituted in 1999 after the restructuring of CEL, is responsible for the maintenance and expansion of the transmission system.

Distribution

In El Salvador, there are five distribution companies. The market share for each of them in 2006 was:
CAESS, CLESA, EEO and Deusem are controlled by AES Corporation.

Renewable energy resources

The 2007 National Energy Policy supports the diversification and increase of energy sources, mainly through renewable energy such as hydroelectricity, geothermal, solar, wind power and biofuels. Besides hydroelectricity and geothermal energy, the government foresees the addition of 50 MW of renewable generation in the next 10 years in the form of wind power, solar power, biomass and mini-hydroelectric plants.
In November 2007, El Salvador approved the Fiscal Incentives Law for the Promotion of Renewable Energy. This new legal framework includes incentives such as a 10-year tax exemption for projects below 10 MW of generation capacity. A new System for the Promotion of Renewable Energy contemplates the creation of a Revolving Fund for the Promotion of Renewable Energy that would provide soft loans and guarantees and assist in the financing of feasibility studies for new projects.

Hydroelectricity

Currently, hydroelectric plants account only for 36% of the electricity produced in El Salvador. The public company CEL owns and operates 97% of the capacity. The four hydroelectric plants in El Salvador are: 5 de Noviembre, Guajoyo, Cerrón Grande, and 15 de Septiembre, all of them on the Lempa River.
In this sector, the projects currently underway are:
This expansion of the hydroelectric capacity would add 351 MW to the system in the next 5 years, a 76% increase in current capacity. In addition, if the bi-national projects El Tigre and El Jobo and Piedra de Toro with Honduras and Guatemala were carried out, 488 MW of additional capacity would be added to the generation system.

Wind

El Salvador's wind potential is currently being studied by Comisión Hidroeléctrica del Río Lempa and the Finnish Meteorological Institute.

Solar

A solar map of the country is also under development.

Geothermal

Currently, there are two geothermal facilities in operation in El Salvador, the 95 MW Ahuachapan, and the 66 MW Berlin plant. Majority state-owned power company LaGeo, formerly Gesal, operates the two plants. LaGeo is currently expanding the two existing geothermal plants, as well as conducting a feasibility study for a third plant, Cuyanausul. It is expected that the three projects add 64 MW of installed electric generation capacity by 2007.
The 2007 National Energy Strategy determines that potential geothermal capacity in El Salvador is about 450 MW. Expansion plans could result in 183 MW additional capacity in the period 2006-2014, with projects to be developed in Ahuachapán, Berlín, San Vicente and Chinameca.

History of the electricity sector

Early history

Until the mid-1990s, the power sector in Salvador operated through the government owned Comisión Hidroeléctrica del Río Lempa, which provided generation, transmission and distribution services. The electricity sector restructuring that led to the unbundling of electricity generation, transmission and distribution and the horizontal division of generation and distribution into several companies was carried out in the period 1996-2000. The Electricity Law and its secondary legislation were enacted in 1996 and 1997 respectively through initiatives led by the Electrical Energy Directorate within the Ministry of Economy. The General Superintendence for Electricity and Telecommunications was created as part of the reform and assigned the responsibility of applying the sector laws and monitoring compliance with them.
The electricity Law in El Salvador affords a high degree of liberty to market agents. Article 8 explicitly authorizes vertical integration in generation, transmission, distribution and supply. The only limitation consists of prohibiting generation, distribution and supply companies from owning shares in Etesal, the transmission company that resulted from the restructuring of CEL. Such an allowance, together with the organization of a price-based spot market, is surprising in a small system with few operators.

21st century developments

The remuneration of generators in the spot market did not generate interest from private producers to obtain high returns and therefore install new capacity. As a result, the Government was concerned with the possibility that a lack of new generation capacity could lead both to higher spot prices and higher tariffs, lower reserve margins and eventually lead to a supply crisis in which it could be forced to invest in the sector. In order to address this problem, in 2003 and 2004, the Government instituted rules for allowing competitively bid long-term contract prices to be reflected in consumer tariffs and empowered the regulator to shift to a cost-based market if evidence of market manipulation emerged.
In July 2005, as a result of the high international oil prices, the government created the National Emergency Committee to Address High Oil Prices in an attempt to analyze and promote measures to minimize impacts. This Committee promoted certain specific actions such as the spreading out working schedules to reduce vehicle traffic. Less than one year after the creation of the Committee, the necessity to broaden its scope of action was acknowledged, which led to the creation, in July 2006, of the National Energy Council. The CNE will propose, manage and contribute to the agencies in charge of approving energy strategies that participate in the country's socio-economic development in harmony with the environment.
In May 2007, the Salvadoran government produced its National Energy Policy, whose main objectives are: ensuring proper, continuous, quality and reasonably priced energy supply; reduce vulnerability in energy provision through diversification of the country's energy sources; minimize environmental impacts; and increase energy services coverage to the population and to the economic sectors. The specific objectives and strategic lines of the National Energy Policy include: diversification and increase of energy sources; expansion of coverage; promotion of market efficiency and establishment of clear and stable rules; promotion of energy efficiency; and support for energy integration.
Since November 2007 the Salvadoran government has been evaluating a Natural Gas law, since Natural Gas is not included nor regulated under the current Hydrocarbons Law. This move has been propitiated because of a new large-scale natural gas project being developed by Cutuco Energy Central America. This project will use Natural Gas to generate 525 MW, more than half of what is currently generated in El Salvador.

Regional integration, the SIEPAC project

In 1995, after almost a decade of preliminary studies, the Central American governments, the government of Spain and the Inter-American Development Bank agreed to the execution of the SIEPAC project. This project, together with the Plan Puebla Panama aims at the electric integration of the region. Feasibility studies showed that the creation of a regional transmission system would be very positive for the region and lead to a reduction in electricity costs and to improvements in the continuity and reliability of supply. In 1996, the six countries signed the Framework Treaty for the Electricity Market in Central America.
The design of the Regional Electricity Market was done in 1997 and approved in 2000. MER is an additional market superimposed on the existing six national markets, with a regional regulation, in which the agents authorized by the Regional Operational Body carry out international electricity transactions in the region. As for the infrastructure, EPR is in charge of the design, engineering, and construction of about 1,800 km of 230kV transmission lines. The project is expected to be operational by the end of 2008.

Tariffs and subsidies

Tariffs

Electricity prices are regulated by SIGET. They comprise generation, transmission, distribution, and supply components. In 2005, the average residential tariff in El Salvador was US$0.139 per kWh, which is above the US$0.105 per kWh weighted average for LAC. In contrast, the average industrial tariff for El Salvador, US$0.103 per kWh was below the US$0.107 per kWh average for LAC.
Electricity prices vary considerably from one distribution company to another. Small consumers have high prices and larger consumers have lower prices. This is an indication that tariffs in El Salvador reflect costs better than those in other countries.

Subsidies

For residential users with consumption levels below 100 kWh, 86% of the difference between the full tariff and the maximum prices established in November 1999 is subsidized. Those maximum prices are:
In 2006, according to the available data, 809,536 users were subsidized. Together, these consumers accounted for 10.6% of the total energy demand at the distribution level.

Investment and financing

Expansion plan requirements include, in addition to generation additions, transmission investments and distribution investments, including rural electrification. Investment requirements for the period 2005-2009 were estimated as follows:
TotalPublicPrivatePublic/ Private
Generation298884206
Transmission4747
Distribution8484
Rural electrification1018318
TOTAL530138186206

Source: World Bank 2006
Public/private partnerships constitute the major source of financing for generation. They
include investments in geothermal facilities through La Geo and its strategic investor, which are likely to go ahead; other investments in this category include the Chaparral power plant. It is also important to note that these estimates are just for investments required within El Salvador. They do not take into account financing required for the 300 MW of firm generation capacity assumed to be available from regional sources through the SIEPAC line.

Rural electrification

The budgeted investment in rural electrification during 2004-2009 amounts to around US$100 million, financed as summarized in the following table:
GovernmentMunicipalitiesDistribution companiesTotal
Isolated systems129.62.424
New lines28.828.814.472
Substations3.81.35
TOTAL44.638.418.1101

Source: World Bank 2006
Rural electrification projects are executed mainly through the Social Investment Fund for Local Development, in operation since 1990. The FISDL has executed a large
number of projects totaling over US$400 million, although it has faced obstacles to achieve its goals, mainly due to a lack of secure financing.
One of the most ambitious projects for rural electrification will be carried out during the next 5 years in the North of the country through a co-investment project of the Government with the Millennium Challenge Account in 94 municipalities. The goal of the project is to increase service coverage from the current 78% to 97% in 2012. Total investment required has been estimated at US$40 million. This project will be implemented through the Electricity and Telephone National
Investment Fund. According to the FINET Creating Law, resources for the
construction and improvement of electrical infrastructure will be granted through the auctioning of subsidies. For the allocation of funds to implement this rural electrification sub-activity, electricity distribution companies, authorized by the Electricity and Telecommunications Superintendence will be able to participate.

Summary of private participation in the electricity sector

Until the mid-1990s, the power sector in Salvador operated through the government owned Comisión Hidroeléctrica del Río Lempa, which provided generation, transmission and distribution services. The electricity sector restructuring that led to the unbundling of electricity generation, transmission and distribution and the horizontal division of generation and distribution into several companies was carried out in the period 1996-2000.
In 2006, there were 11 generation companies in El Salvador, with 18 out of 22 generation plants in private hands and 97% of hydroelectric capacity owned by the public company CEL. As for transmission, it is in the hands of one government-owned company, Etesal, while distribution is controlled by five privately owned companies.
ActivityPrivate participation
Generation65% of installed capacity
Transmission0%
Distribution100%

Electricity and the environment

Responsibility for the environment

The Ministry of Environment and Natural Resources is the institution in charge of the conservation, protection and sustainable use of the natural resources and the environment.

Greenhouse gas emissions

estimated that CO2 emissions from electricity production in 2003 were 1.57 million tons of CO2, which corresponds to 25% of total emissions from the energy sector.

CDM projects in electricity

Currently, there are three registered CDM projects in the electricity sector in El Salvador, with overall estimated emission reductions of 385,553 tCO2e per year. One of the projects is a , another one a and the third one a .

External assistance

Inter-American Development Bank