Denver Millennium Bridge


The Denver Millennium Bridge is the world's first cable-stayed bridge using post-tensioned structural construction. Its 200-foot white tapered steel mast rises above Denver's northwestern skyline, connected to the bridge deck and foundation anchors by steel cables. This unique footbridge crosses railroad tracks and the regional light rail system, climbing no higher than 25 feet above street level, thereby minimizing the height pedestrians must climb. Located near LoDo,in Riverfront Park, the Millennium Bridge connects the popular 16th Street Mall with the Commons Park in the Central Platte Valley District of the Union Station neighborhood. The bridge is the first of three pedestrian bridges between Downtown Denver and the Highland neighborhood.

Design

The name, Denver Millennium Bridge, honors a milestone in time and in Denver's architectural development. To meet the structural challenge of spanning 130 feet without a steep increase in elevation, the deck's structure must be as thin as possible while remaining stable. This suspension bridge uses a steel frame that derives its stiffness from tension by using a single mast that is tilted toward one end of the bridge. Cables supporting the bridge deck are welded to both sides of the mast, but cable to foundation anchors attach to the mast only from the side of the bridge toward which the mast is tilted.
Supportive tension is created by using the mast as a lever to pull the deck up into a shallow arc, keeping the opposite end of the bridge secured by two steel rods. With the mast raised, concrete was poured onto the metal deck frame, pushing the deck into place and applying tension to the cables. The post-tensioned structural construction allows for a substantially thinner 6-inch-thick reinforced concrete slab-on-metal deck. The deck structure is supported by secondary I-Beams, and has an average width of 80 feet.

History

Preliminary work on the $9-million footbridge began in 1999. The structural and civil engineering firm Ove Arup & Partners, in conjunction with the architectural design company ArchitectureDenver, developed the design.
Contractor Edward Kraemer & Sons, Inc. implemented the design, subcontracting Colorado Bridge and Iron to fabricate the steel components. The mast was constructed of cone-shaped steel plate sections welded together to form a 3-foot base, 7-foot midsection and 1.5-foot tip diameter.
Glass-enclosed elevator towers on both ends of the footbridge accommodate pedestrians who have difficulty climbing the stairs leading up to either end of the bridge from street level. The Millennium Bridge was completed and officially opened by Denver Mayor Wellington Webb on April 22, 2002.
On April 24, 2014, a $1-million renovation began on the footbridge to increase pedestrian accessibility to the bridge, which allows for smoother access between downtown Denver and the Central Platte Valley and Lower Highlands neighborhoods. Part of this renovation includes modifications to the east staircase and an upgrade to LED lighting which will allow for the colors to be changed and increase energy efficiency by up to 80%.

Awards