Deep Underground Support Center


The Deep Underground Support Center was a Strategic Air Command nuclear bunker proposal in 1962 for "a hardened command post...to withstand a 100-megaton weapon with a 0.5 n.m. CEP". Favored for a mine near Cripple Creek, Colorado, the DUSC was to be deep and be "able to accommodate some 200 people for to handle the large volume of data processing and analysis required for strike assessment, as well as follow-on strike and other decisions." Cost estimates for the SAC Control System facility increased to $200 million, and when the operational year slipped from 1965 to 1969, SAC decided in 1963 "for a long-endurance, all airborne concept instead", and the JCS and OSD concurred with the DUSC project cancellation.