Coryton Refinery


Coryton Refinery was an oil refinery in Essex, England, on the estuary of the River Thames from central London, between Shell Haven Creek and Hole Haven Creek, which separates Canvey Island from the mainland.
It was a part of the Port of London and was the last of the three major refineries on the Thames Estuary to remain in operation, following closure of Shell Haven and BP Kent. Output was delivered by road, sea and rail, and it was linked to Stanlow Refinery in North West England by the UK Oil Pipeline. There is a 753 MW gas-fired power station, opened in 2002 and run by Coryton Energy Co Ltd, part of Intergen.
In January 2012 Petroplus filed for bankruptcy. Coryton Refinery ceased production in June 2012. The site is being turned into an industrial hub to be called Thames Enterprise Park.

History

Explosives factory

In 1895 the ammunition firm Kynochs built an explosives factory at the site. This opened in 1897, with an estate for employees called Kynochtown. Products included cordite, guncotton, gunpowder, and cartridges. Kynochs also built the Corringham Light Railway, with a passenger branch from the works to Corringham and a goods branch to the London, Tilbury and Southend Railway at Thames Haven. The Kynoch works closed in 1919.

Oil storage depot

In 1921 the site and CLR were taken over by coal merchants Cory Brothers Ltd of Cardiff to build an oil storage depot, with Kynochtown renamed Coryton. Sources differ as to whether Corys, who sold a well-known brand of petrol, Corys' Motor Spirit, also built a refinery at the site. Cracknell states that Cory Bros 'turned to the manufacture and distribution of oil products' for which they 'constructed oil storage tanks and a cross-cracking plant'. In 1937 the annual throughput of Coryton refinery was 250,000 tonnes.

Refinery

In 1950 Coryton and the CLR were sold to the American Vacuum Oil Company, later Mobil. The CLR to Corringham was closed, but the branch from Thames Haven was upgraded to main-line standards.
A new refinery came on stream in 1953. In 1954 the annual throughput of Coryton refinery was 850,000 tonnes. By 1964 the annual throughput of Coryton refinery was 2.4 million tonnes, with a planned extension of a further 0.9 million tonnes. Coryton village was demolished and absorbed into the refinery site in the 1970s. In 1977 work started on an extension to the refinery including a hydrogen fluoride alkylation unit to produce more gasoline. In 1978 about 1.5 million tonnes of oil and refined products were stored in the refinery tank farm, and about 800 people worked on the site. The alkylation unit was commissioned in late 1981 and included a water spray system to dissolve any releases of hydrogen fluoride.

BP

Coryton was operated by BP from 1996, when Mobil's fuels operations in Europe were placed into a joint venture with BP. In 1996 BP purchased land to the west of the refinery from the neighbouring Shell refinery; the Shell facilities were demolished and the land was proposed for future expansion. Following the merger in 1999 of Mobil with Exxon, the remaining interest in the refinery was sold to BP Amoco in 2000.

Petroplus

In 2007 the plant was sold by BP to Petroplus for £714.6m.
On 24 January 2012 it was announced that Petroplus had filed for bankruptcy, putting the refinery's future into doubt. To alleviate a possible surge in fuel prices, oil supplies were ordered from other refineries in the UK, such as the Stanlow Refinery via the UK oil pipeline network. Shipments from Coryton resumed on 26 January following agreements signed by the administrators.

Shutdown

;PwC
On 28 May 2012 it was announced that the refinery would close due to PricewaterhouseCoopers, the administrators, having failed to find a buyer. Igor Yusufov's Energy Investment Fund was the only potential bidder ready to keep the refinery operating. On 28th Feb 2013 the gas supply to the site was shut off. Around twelve hours later the flare went out, bringing to an end over 60 years of operations at the refinery.

Deepwater fuel import terminal

The refinery is being turned into a diesel import terminal by Vopak, Shell and Greenergy. It will initially have a capacity of.

Process units

Their main operating units were:
The thermal reformer unit and the Thermofor catalytic cracking unit produced different grades of petrol and diesel. Along the south side of the refinery area, the propane de-asphalting unit, solvent refining furfural unit, MEK dewaxing unit and continuous percolation unit constituted consecutive stages in the production of lubricating oils and waxes.

Statistics

The Coryton refinery site covered an area of 370 acres. The main processing units were to the western end of the site, with the tank farm occupying the north and eastern part of the site.
Crude oil was received from tankers of up to. There were five jetties on the Thames, the most easterly extended into the deep water channel. In 2005 BP acquired a fleet of three new 32 m tugs for towing, mooring, fire-fighting and pollution control at the plant. They were named 'Corringham', 'Stanford' and 'Castle Point' after nearby locations.
The maximum refining capacity was 11 million tonnes per year or 208,000 bbl/day.
In 2000 the principal sources of crude oil for refining at Coryton were: North Sea ; Middle East ; Africa/Mediterranean ; and Russia.
There were about 220 storage tanks on the site, the largest were the floating-roof crude oil storage tanks each with a capacity of 80,000 tonnes.
Cooling water for the refinery was taken from the Thames. After use the water was treated and discharged into Hole Haven Creek. A moat around the site collects run-off, this was taken to the water treatment plant and was oxygenated prior to discharge into the Thames.
Product output:
The principal product from the refinery were fuels, comprising:
About 5.0% of the fuel was used on site for the refinery processes.
Non-fuels comprised 4.0% of the production comprising Lubricants, Bitumen and Wax.
About 40% of the production from Coryton was exported abroad by ship. The majority was distributed around the UK by pipeline, road tanker, rail or coastal shipping.

Fire

A major fire occurred on 31 October 2007. Despite the scale of the blast, which was reported to cause buildings to shake away, there were no physical injuries and only partial disruption to the refinery.