Constantine tramway


The Constantine Tramway is a tram way system which has been operating in Constantine, Algeria, Algeria, since 2013.
There have been several delays and cost over-runs in the construction of the tramway. Originally scheduled to enter revenue service in November 2011, the first section of 8.9 kilometres with 10 stations between the Ben-Abdelmalek-Ramdhan stadium and Zouaghi opened on 4 July 2013 and includes 5 additional stations as of 2019.

Construction

The tram system construction project was overseen by Pizzarotti an Italian construction company.
Construction of the tramway system of the city of Constantine – stretching for 15 km from the terminal in Zouaghi District to the station of Ben-Abdelmalek Stadium, the line runs from the city’s old-town alongside the main historical Mosque, passes over the slope of the Oued Rhumel, and proceeds through the university area, ending in the modern part of the city. The works include 11 stations, three of which are multimodal, two viaducts stretching 465 and 114 metres, an underpass for urban traffic, 12 supporting walls having an overall length of 1,885 metres, a ground level depot that guarantees the maintenance and parking of 27+20 trains. The works include the renovation of the stadium, the demolition of the existing stand in order to allow for the passing of the line and the building of the four stands.