Circle Drive is a major road constructed as a ring road in Saskatoon, Saskatchewan, Canada. The northeastern portion of the road is part of the Yellowhead Highway. It was first conceived in 1913 by the city commissioner and completed exactly 100 years later in 2013.
History
Construction of a ring road in Saskatoon was first proposed in 1913 by city commissioner Christopher J. Yorath. He conceived the first comprehensive town plan, which included inner and outer "encircling boulevards". Parts of the present-day roadway follow the course Yorath laid out, though some route proposals were rejected, such as one for the southern leg that would have taken the roadway over an island south of present-day Saskatoon that, years later, was named in honour of Yorath. It wasn't until the 1950s as the city expanded outward that the present roadway corridor was established. Construction funding, originally estimated at $10 million, was allotted and construction began in 1961.Rather than the complete route being built at once, Circle Drive was built in sections, as required by traffic conditions and allowed by available funding. As a result, it would take 52 years for the project to be completed.
The first sections to be built were a northwest segment between Warman Road and 11th Street West, which initially included only a single interchange at Idylwyld Drive ; some of the route made use of a previously existing arterial commercial road, 42nd Street, and most of Dundonald Avenue, a street that followed the western edge of the city, was removed to make way for the freeway. The southeast segment, from Lorne Avenue to College Drive, was constructed concurrently with the Idylwyld Freeway, a connector from Circle Drive into the downtown core. Not including the Idylwyld Freeway, only two interchanges were initially built on the southeast leg: a limited-access one at 14th Street, and a large cloverleaf interchange at the junction of the realigned highways 16 and 11. In lieu of an interchange at 8th Street, a large traffic circle or roundabout was constructed.
1983 extension and north bridge
For close to 15 years, the two sections of Circle Drive sat apart. The next portion of the roadway completed was the northeast quadrant, from College Drive to Warman Road, connecting the two extant sections. This included the construction of the Circle Drive Bridge across the South Saskatchewan River and was completed in 1983 after several years of construction. The original project involved interchanges at Warman Road and 108th Street; over the next 20 years additional interchanges were constructed at Attridge Drive/Preston Avenue North and College Drive. Also during the 1980s, the northwest leg of Circle Drive added an interchange at 33rd Street, while the 8th Street traffic circle in the southeast was removed after years of complaints and accidents, and by the 1990s an interchange was constructed as a replacement. Also in the 1990s an interchange was added at Taylor Street's junction with Circle Drive.A few years after its completion, the northeast extension was designated the through route for the Yellowhead Highway, replacing the previous route through downtown along Idylwyld Drive.
In the early 2000s, in preparation for construction of the southwest leg, a major interchange was added where Circle Drive intersected several major roads: 22nd Street West, Fairlight Drive and Confederation Drive, replacing a complex series of traffic lights. Also in partial preparation for the extension, an interchange at Clarence Avenue South was added in the late 2000s.
2013 extension and south bridge
The last remaining southwest section of Circle Drive, between 11th Street West and Lorne Avenue, including the Gordie Howe Bridge, opened to traffic on July 31, 2013, after several years of construction and a delay of nearly a year. Approximately 7 km in length, it connects the C.N. Industrial area to the Holiday Park neighbourhood, travelling through property annexed from the Saskatoon Golf and Country Club. It includes a new bridge, located just north and parallel to the Grand Trunk Bridge.The bridge has six traffic lanes and a pedestrian walkway suspended underneath, similar to the north bridge. National and provincial funding each amounted to $172 million and the City of Saskatoon committed $70.5 million towards the project. The total cost of the project is estimated at $272.5 million.
The City of Saskatoon hired a private contractor to build the bridge. Three companies submitted proposals: PCL Construction, Peter Kiewet Sons and Graham Construction/Flatiron. The Graham/Flatiron bid was selected on March 29, 2010. Construction of the bridge and associated roadways was expected to be complete by September 30, 2012. However, record rainfall, high water tables and an early snowfall made that deadline unfeasible, and the roadway ultimately did not open until July 31, 2013.
Environment Canada and Fisheries and Ocean oversaw environmental impacts on the river. The project included four new interchanges: one at Secondary Highway 762, one at 11th Street West which utilizes some of the land area given up by the Maple Leaf Foods building demolition in 2010, and additional interchanges at Highway 219 and the Idylwyld Freeway. In the later stages of construction, construction began on an interchange along the older southeast section of Circle Drive at its intersection with Preston Avenue South; this was completed several months after the southwest extension and technically marked the completion of the Circle Drive project.
The Holiday Park golf course needed to re-landscape two holes on the golf course, as holes 6 and 7 were affected. The southwest and southern periphery of Diefenbaker Park was also impacted as that portion of the park was taken over by the freeway. Some roadways in Montgomery Place and Holiday Park Industrial were also realigned and the at-grade intersection at Circle and Clancy Drive was also revised. Another impact of the project is a new rail switching yard near 11th Street and Dundonald Avenue. In 2010, the City of Saskatoon signed a non-binding agreement in principle with the Canadian National Railway and Canadian Pacific Railway to move railcar switching out of the downtown Central Industrial neighbourhood.
Additional road revisions were required as part of the project: 11th Street West, westbound from the new interchange with Circle, was replaced with the 11th Street West Bypass. Several streets within the South West Industrial and C.N. Industrial subdivisions were also realigned or shortened. The portion of Dundonald Avenue between Mountbatten Street and Valley Road was designated for closure; this required the construction of a new access road off Valley Road connecting to the city landfill while Valley Road itself was realigned to connect directly with Circle Drive. Development of the Circle Drive/Valley Ridge interchange also required the permanent closure of the Fletcher Road access point into South West Industrial via Dundonald, leading to city planners adding a new roadway, Dawes Avenue to provide an extra access to 11th Street and, in turn, Circle Drive.
The first portion of the southwest extension to open was 11th Street to Valley Road, which was open by late spring of 2013.
Future development
Although the circle is now "closed", the City of Saskatoon is investigating future improvements to older parts of the freeway, including revisions to the aged Idylwyld Drive North/Circle Drive interchange and finding ways to deal with traffic congestion along the non-freeway "42nd Street" section of the road. As of October 2013 the City's Projected Growth Concept Plan map shows a proposed interchange at Airport Drive. There remain two further seagull intersections along the western freeway portion of Circle Drive at Laurier Drive and Clancy Drive that the city is looking to redevelop in the future in order to create "freeflow" conditions along the non-42nd Street portion of the road.In February 2018, the City of Saskatoon announced preliminary plans to replace the aging cloverleaf interchange where Circle Drive intersects Highway 11 and 16 in the southeast corner of the city. With an estimated cost of $280 million, work on the upgrade is not expected to begin until the late 2020s or early 2030s.
Interchanges
As of 2004, the Circle Drive Bridge portion of the road was carrying up to 50,000 vehicles per day, more than twice the volume from when it opened. Due to the greatly increased traffic the bridge was significantly expanded in 2007. Over the years, a number of at-grade intersections were converted to grade-separated interchanges to improve traffic flow. They include:- Idylwyld Drive North – 1960s
- 33rd Street – November 10, 1980
- Warman Road – July 1, 1983
- Taylor Street – September 16, 1996
- 8th Street – October 31, 1999 – initially constructed as a large traffic circle in the late 1960s, this traffic control device proved unpopular and was replaced with a split intersection in the mid-1980s, and ultimately an interchange in 1999.
- Attridge Drive/Preston Avenue North – October 1, 2001
- 22nd Street/Confederation Drive/Fairlight Drive – October 28, 2002
- College Drive – October 4, 2006
- Clarence Avenue – November 20, 2007
- Preston Avenue – Completed in autumn of 2013
As noted above, the junction of 8th Street and Circle Drive was originally, in the late 1960s, constructed as a large roundabout dubbed the "Traffic Circle". The first such construction of its kind in Saskatchewan, motorists found it difficult to navigate, leading to local media airing advisories on how to use it. The site of many accidents over the years, and dubbed the most accident-prone location in the city, the circle was ultimately dismantled in the 1980s and replaced with a split at-grade intersection in anticipation for a standard diamond interchange that was constructed in the 1990s.