California State Route 180


State Route 180 is a state highway in the U.S. state of California. It runs through the heart of the San Joaquin Valley from State Route 33 in Mendota through Fresno, and then east towards the Sierra Nevada to Kings Canyon National Park.
An unbuilt segment of SR 180 is defined west to Paicines. Nearly the entire stretch from the Kings River crossing to Cedar Grove is eligible for the State Scenic Highway System, and nearly the entire route from Paicines to Cedar Grove is part of the California Freeway and Expressway System. Two short segments travel through national parks, so are not state maintained and are the exceptions to the above: a segment through the General Grant Grove section of Kings Canyon National Park, and the far eastern end of the road inside of Kings Canyon National Park. The freeway through Fresno has the distinction of having the most heavily traveled section of road in the San Joaquin Valley. Major plans include an extension west from Mendota to Interstate 5.

Route description

The actual western terminus of SR 180 is at SR 33 in Mendota, with an unconstructed portion defined west across Interstate 5 to SR 25 in Paicines, currently signed as County Route J1. In Mendota, the route is carried on Oller Street and San Benito Avenue, then travels along Whitesbridge Avenue through Kerman to Fresno.
Through Fresno, from Brawley Avenue to DeWolf Avenue, it is a 4-to-10-lane freeway intersecting SR 99 in a 2-level stack, SR 41 in a 4-level stack, and the southern terminus of SR 168; officially, CalTrans considers the freeway SR 180S until the old highway on downtown surface streets is relinquished.
SR 180 is a busy commercial route along most of its urban length, being a main street of Mendota, Kerman, Minkler, and Fresno's Squaw Valley, as was the old highway through Fresno. In east Fresno, the Kings Canyon corridor is one of the largest multicultural business districts in the city, together with east Belmont a mile north. The old Fresno "main street" of Broadway has long been torn down for Chuckchansi Park and Fulton Mall parking, but Stanislaus, Tuolumne, and Ventura Streets remain commercially viable, despite having fallen into some neglect over the years. This segment is being redeveloped as part of the Ventura Widening and Downtown Entryway Beautification Project, as well as the preservation or relocation of a number of historic buildings in Old Armenian Town on Ventura, with the creation of a new commercial district by the same name.
The old routing of SR 180 through downtown Fresno remains on the books, but is no longer signed and not considered a business route. The road no longer connects with its freeway bypass at all; the east and west ends terminate in cul-de-sacs. Local agencies are now generally forced to maintain or improve the road.
East of Fresno, the freeway links up with the original routing on Kings Canyon Blvd, and continues north of Sanger, through Centerville, Minkler and Fresno's Squaw Valley, before arriving at the entrance to Sierra National Forest near Dunlap. It follows the Kings River into General Grant Grove, where SR 198 splits off south toward Sequoia National Park. SR 180 turns north, passing through Wilsonia, leaving General Grant Grove, then turns east as it nears the South Fork of the Kings River near Hume, passes through Cedar Grove, and terminates in Kanawyers at the entrance of the Kings Canyon National Park. The entire portion beyond Hume Road is closed during winters, usually after the first snowfall.
The majority of SR 180, from SR 25 to the entrance of General Grant Grove, is part of the California Freeway and Expressway System, but only the piece in Fresno has actually been constructed to freeway standards. A length east of unbuilt State Route 65 near Minkler to the boundary of Kings Canyon, excepting the portion through General Grant Grove, is eligible for the State Scenic Highway System; most of this segment was officially designated as a scenic highway by the California Department of Transportation in 2016. The road inside of General Grant Grove and Kings Canyon is a National Forest Service Byway known as the Kings Canyon Scenic Byway. The old route east of SR 99 to the General Grant Grove is part of the National Highway System, a network of highways that are considered essential to the country's economy, defense, and mobility by the Federal Highway Administration.
In Fresno, SR 180 is Sequoia-Kings Canyon Freeway, named for its destinations to the east in the Sierra Nevada - Sequoia National Park and Kings Canyon National Park. Overlapping this, between SR 99 and Clovis Avenue it is the Senator Jim Costa Highway, after a longtime Assemblyman, Senator, and Congressman for Fresno; between Clovis Avenue and General Grant Grove Park, in the County of Fresno, it is the Senator Chuck Poochigian Highway, after the State Senator who sponsored the funding bills for its completion. The SR 41/SR 180 interchange is named the Rose Ann Vuich Interchange, for the longtime State Senator who secured funding for the initial freeway. Inside of Kings Canyon it is the Kings River Highway.
SR 180 handles a wide range of traffic volumes, from a low of 5,000 per day near Kerman, to over 160,000 at the highly congested SR 168 interchange, the most-traveled highway segment in the San Joaquin Valley. A study into the use of Measure C funds found that traffic volumes will likely increase between 50% and 100% across the entire road by 2020, especially in the more rural areas.

History

In 1905, the easternmost portion of what is now SR 180 was created as Legislative Route 41, from General Grant Grove to the Kings River Canyon; in 1919, a bond measure funded the extension and upgrade to Fresno, which was completed by 1933. In 1935 LR 41 was extended to be a road from Kings Canyon to Tracy, signed as SR 180 to Mendota and SR 33 beyond.
Through Fresno from the west, the route turned on B Street, Stanislaus Street, down Broadway, turned at Ventura Street and left downtown on it, becoming Kings Canyon Blvd. At some point the road was split into parallel one-way roads, with eastbound traffic using Amador Street, A Street, and Tuolumne Street before merging into Broadway. The Stanislaus and Tuolumne bridges were built in 1958 to alleviate congestion at the train tracks and local industry, and when US 99 moved to a freeway bypass in 1962, the 180 co-routing followed it. The bypassed route was given back to the City of Fresno; the bridges still exist but Broadway is now gone between Fresno and
When California converted its old Legislative routes to individual State routes in 1963, SR 180 was legally extended to US 101 in Hollister, then truncated at SR 25 in 1984 after the construction of SR 156. None of this route has been improved, and is signed only as County Route J1 for most of its extent. The existing routes from I-5 to SR-25, passing through Panoche and Llanada, are rugged and not currently state-maintained.
The Fresno Master Freeway plan was developed in the postwar boom, with a western bypass by 99, an eastern bypass by 41, and a northern bypass by 180. 99 was constructed in 1962, but lack of funds and a "freeway revolt" prevented the construction of the SR 180 and SR 41 freeways. 180 was particularly controversial because it cut through one of Fresno's historic districts. It was delayed so long that CalTrans was prepared to tear down the stack interchange at SR 41 and delete the routing, but in 1988 funds finally became available thanks to the local Measure C sales tax; construction of the viaduct began in 1992, opening between SR 99 and SR 41 in 1995, to SR 168 in 1999, and extending east of 168 and west of 99 in the 2000s. Overall the final product was nearly as originally envisioned by the Highway Commission.
In recognition that the freeway connecting SR 41 and SR 168 is by far the most traveled segment of road in the San Joaquin Valley and prone to daily congestion and accidents, Caltrans constructed of the "Fresno 180 Braided Ramps" between the freeways. The first ramps opened in 2013 and the entire project was then completed in early 2014. These ramps allow direct access between SR 41 and SR 168 without entering the main SR 180 freeway, making it almost a double braided ramp. The project was delivered in a new format for Caltrans called Design-Build, one of the first projects constructed in the state's pilot program authorized by the State Legislature, wherein the contractor both designs and builds the project with Caltrans oversight.
Some of the downtown segment has been included in various revitalization proposals: The award-winning West Fresno Community Vision Plan of 2004 intends to create livable mixed-use areas between Whitesbridge and California Avenues; it was adopted by the council and is slowly being implemented.

Controversy

The routing of the SR 180 freeway through central Fresno, now known as the 180 Gap neighborhood, split a well-defined working-class neighborhood in half and destroyed many large, historic buildings along Van Ness Avenue and surrounding area. Even after funding dried up, the neighborhood declined dramatically with the ever-present knowledge that everything in its path would be demolished as soon as the money appeared; low property values led to many buildings becoming slums or being condemned and razed long before the freeway came. By the 1980s, community pressure was increasing for CalTrans to either purchase the remaining properties or abandon the route, culminating in a lawsuit against the state, and in 1988 the decision was made to begin eminent domain purchases and construction.

Future

A planned four-lane expressway extension from Mendota to I-5 is in the works, with several proposed routes that bypass Mendota and Kerman, but no final route has been decided on yet.
The section between Smith Road and Frankwood Avenue is currently being constructed to a 4-lane divided expressway. The new expressway will bypass the communities of Centerville and Minkler to save eligible historic buildings on the current route. There will be new frontage roads, and roads that currently intersect with SR 180 will connect via connector roads. The project has an estimated completion date of 2020.

Major intersections