The Blue Line is a rapid transit line in the Greater Boston metropolitan area, one of four rapid transit lines operated by the Massachusetts Bay Transportation Authority. It runs from Bowdoin station in downtown Boston under Boston Harbor to East Boston and Revere on the inner North Shore, where it terminates at Wonderland. The stop at Airport Station, by way of a free shuttle bus, is one of two rapid transit connections to Logan International Airport. In 1967, during a systemwide rebranding, the line was assigned the blue color because it passes under the Boston Harbor. With an end-to-end travel time of less than twenty minutes, the Blue Line is the shortest of Boston's heavy-rail lines and the only line to have both third rail and overhead catenary sections.
The East Boston Tunnel was built as a streetcar tunnel in 1904 with Howard A. Carson as chief engineer; after an extension to Bowdoin in 1916, it was converted to heavy rail metro rolling stock in 1924. In 1952 and 1954 the line was extended along the former route of the Boston, Revere Beach and Lynn Railroad, in a project intended to reach Lynn but ultimately cut short to Wonderland. Further extensions to Lynn and Charles/MGH downtown are long-planned but not yet funded. From approximately 1998-2011, the MBTA made most Blue Line stations fully accessible as part of a larger effort to accommodate 6-car trains on the line., the only station in service on the Blue Line which is not fully accessible is the downtown Boston terminus Bowdoin.

History

The East Boston Tunnel under Boston Harbor was the first North American subway tunnel to run beneath a body of water when it opened in 1904. and the second underwater vehicular tunnel of significant length built in the United States. The tunnel was constructed using a modified version of the Greathead Shield; of the tunnel is actually under water. The excavation took two-and-a-half years, and cost $3 million and the lives of four workmen.
Initially designed to carry streetcars, the tunnel ran from Maverick Square in East Boston to downtown Boston's Court Street station, with an intermediate stop at Devonshire. Court Street had pedestrian access to Scollay Square station but transfers to the East Boston Tunnel required an additional fare of 1 cent. In 1906, Atlantic Station was opened, with a connection to the Atlantic Avenue Elevated. Court Street proved to be a problematic terminus as its single-track design limited frequent service.
The Boston Elevated Railway began an extension towards Beacon Hill in 1912. This downtown extension was opened to Bowdoin, with an intermediate stop at Scollay Under, on March 18, 1916. Immediately west of the new Bowdoin station platforms, a tight turnaround loop track underground allowed trains to quickly reverse direction for the return trip. The project also included a new portal at Joy Street, which was used by a Central Square–Orient Heights line. The total cost of the extension was $2.3 million.
Increasing passenger loads soon required a further expansion of the carrying capacity of the harbor crossing. A new, four track station and two loops were constructed under Maverick Square in East Boston. The station was constructed while passenger service through the East Boston Tunnel was maintained. The new Maverick station would have the local East Boston streetcars enter the incline as always, but would stop inside the new station. All of the passengers would disembark the trolleys and cross the platform to the waiting rapid transit trains. A loop was provided west of the station for the trolleys to turn around and return to the outbound side of the station. The rapid transit trains would return to Boston via a loop on the eastern side of the station. A short extension of the tunnel beyond the east loop provided train storage and a couple of inspection pits for light maintenance.
Over the weekend of April 18 to 21, 1924, the East Boston Tunnel was converted from streetcar use to high platform rapid transit, a tightly-staged changeover which had been in planning for three years, requiring 1500 men to complete. Rather than modify the narrow tunnel, the BERy elected to replace the streetcars with brand-new smaller-than-usual high-platform rapid transit cars which could operate in tight clearances—particularly around the tight loop at Bowdoin. Blue Line cars are thus long, substantially shorter than the Orange Line cars and the Red Line cars.
From 1952 to 1954, a surface-level extension was constructed along the recently-defunct Boston, Revere Beach and Lynn Railroad, from Maverick to the current terminus at Wonderland. The original trackage had been narrow gauge, but was converted to standard gauge for this Revere Extension of the subway. The first above-ground station on the new extension served Boston's Logan Airport, and was the first American urban transit connection to a commercial airfield. Beyond Maverick, the power feed was changed from third rail to overhead catenary to reduce the risk of winter ice buildup due to proximity to the ocean.
The line was officially renamed the East Boston Tunnel & Revere Extension by the MTA in 1952, and designated as "Route 3" on system maps. It was renamed as the Blue Line on August 26, 1965, as part of the new MBTA's color-based rebranding. The color blue represented water, as the line passes under Boston Harbor and travels near the coast for much of its length. Until the Silver Line was extended to Logan in 2004-05, the Blue Line was the primary rapid transit connection to the airport.
On April 21, 2018 the SL3 Silver Line service to Chelsea opened with a connection to the Blue Line at Airport station, providing transfer service to Chelsea, the Seaport District and South Station.

Station renovations

Unlike the Red Line and Orange Line, which had substantial new sections and station renovations in the 1970s and 1980s, most of the Blue Line had not been substantially modified since 1954. By the 1990 passage of the Americans with Disabilities Act, only and the eastbound platform at were accessible, with then under construction. In 1988, the MBTA began planning for accessibility modifications as well as platform extensions to accommodate 6-car trains - similar to what had been done on the Orange and Red lines. The project was then expected to be complete in 1994. In 1989, the MBTA awarded design contracts for modernization and platform lengthening at nine Blue Line stations. Final design on a number of the modifications - the Blue Line Modernization Project - began in 1990-92.
The first main construction phase of the project began on June 25, 1994, the line was cut back to at all times to permit reconstruction of the outer stations. and were completely rebuilt, while, and were renovated. A simultaneous $8 million noise reduction program added sound walls at Beachmont and Orient Heights, rubber mats under tracks, and soundproofing of nearby homes. The stations reopened on June 26, 1995. Unlike the other stations, Wood Island was not accessible after the 1994-95 renovation; elevators were not added until 2000.
was closed from October 14, 2000 until October 29, 2001 for renovations, which were completed in 2003. A relocated station opened on June 3, 2004. An extension renovation of, during which the station remained open, lasted from November 2004 to May 2011.
Reconstruction of began on October 4, 2005. The project was sufficiently progressed for six-car trains to enter service on September 15, 2008, though the station was not completed until 2009. Orient Heights was closed from March 23 to November 26, 2013 for a complete reconstruction. closed from March 22, 2014 to March 21, 2016 for a complete renovation and accessibility modifications. This left all Blue Line stations accessible except for, which also has an eastbound platform that cannot be modified for six-car trains.

Proposed expansions

Extension to Lynn

There is a proposal to extend the Blue Line northward to Lynn, Massachusetts. The land to extend the line was purchased for the initial construction of the Revere Extension, but due to budgetary constraints Wonderland station was designated the northern terminus. Two potential extension routes have been identified. One proposed path would run through marshland alongside the existing Newburyport/Rockport commuter rail line, on rail lines formerly operated by the Boston and Maine Railroad. An alternative route would extend the line alongside Revere Beach Boulevard through Point of Pines and the Lynnway, along the remainder of the BRB&L right of way. Other alternatives include increased commuter rail or bus service, or connecting the Blue Line to a commuter rail stop near Wonderland via a short connector.
The Blue Line extension has been proposed in various forms for over 80 years. The 1926 Report on Improved Transportation Facilities and 1945–47 Coolidge Commission Report recommended that the East Boston Tunnel line, which had been converted to rapid transit from streetcars in 1924, be extended to Lynn via the Boston, Revere Beach & Lynn right-of-way. Ever since the 1954 Revere extension was cut short to Wonderland, a further extension to Lynn has been planned. Following on the 1926 and 1945-47 studies, the 1966 Program for Mass Transportation recommended that the Blue Line be extended to Lynn, while the 1969 Recommended Highway and Transit Plan proposed that the extension run as far as Salem. An extension was not present in the 1972 Final Report of the Boston Transportation Planning Review, but the 1974 Transportation Plan revived the project with possible termini of Lynn, Salem, or even Route 128 in Peabody. The 1978 Program for Mass Transportation report and 1983 Transportation Plan both continued support for an extension to Lynn. Despite the continued recommendations, however, other projects like extensions of the Red and Orange lines were given funding instead of the Blue Line.
In 2005, Lieutenant Governor Kerry Healy estimated construction would begin in 2017. Authorization to bond for planning money for the project was included in an April 2008 state bond bill, and $25 million in federal earmarks have been obtained. A 2004 state bond bill authorized $246.5 million on the condition of finding 50% non-state matching funds. The Draft Environmental Impact Report was expected to be complete by the end of 2008, but has been delayed as planners focus on meeting the legal deadline for the Green Line extension to Somerville and Medford.

Red Line–Blue Line connector

The Blue Line and Red Line are currently the only MBTA subway lines without a direct transfer to each other. Various proposals to connect the two lines together exist, including proposals to extend the Blue Line to the Charles/MGH station on the Red Line to create a free transfer, known as the Red Line–Blue Line connector, or to construct pedestrian tunnels linking the State station on the Blue Line to the Downtown Crossing and Park Street stations on the Red Line, creating a Downtown "superstation".
Today, transfers between the Red and Blue Lines can be made by riding the Green Line one stop between the Government Center and Park Street stations, or by riding the Orange Line one stop between the State and Downtown Crossing stations. However, these transfers require passengers to navigate multiple passages and staircases and increase rush-hour congestion on subway lines in the Downtown subway stations, contributing to delays in subway service.
As part of a lawsuit settlement relating to air quality mitigation for the Big Dig highway tunnel project, the Commonwealth of Massachusetts agreed to build a direct transfer connection between the Blue and Red Lines. The Blue Line would be extended beyond Bowdoin station, continuing beneath Cambridge Street to a new underground terminal at Charles/MGH, connecting to the existing elevated Red Line station. In addition to providing a direct transfer between the Red and Blue Lines, this would allow passengers from the North Shore of Boston to reach the Massachusetts General Hospital area without needing to transfer. The MBTA estimated this connection would induce 12,000 new daily boardings at Charles/MGH station, reducing vehicle miles traveled by 5,250 per day.
After failing to take any action for over a decade, and under threat of further lawsuits, the state finally agreed to start detailed engineering design for such an extension. Construction was expected to take six years, but a start date and funding scheme were never announced. The MBTA ultimately decided not to complete the design work necessary to build the Red–Blue connector, as funding for constructing it was seen as an impossibility. The possibility of a public-private partnership to advance the project was studied in 2013. The U.S. Environmental Protection Agency formally released the state from its design obligation in 2015.
The Blue–Red connector was mentioned in Boston's bid for Amazon HQ2 as a "clear goal" for the state. In 2018, the state commissioned a $50,000 study by the engineering firm Vanasse Hangen Brustlin. It estimated a much lower cost for the tunnel—between $200 million and $350 million, depending on the construction method used—and a total project cost of up to $500 million. The lower cost is due to consideration of the cut and cover construction technique, which would be cheaper but more disruptive to vehicle traffic.
The Summer 2018 draft of the MBTA's 2040 planning document includes a potential underground pedestrian walkway between State and Downtown Crossing stations, though the technical feasibility had not been evaluated.

Previous connection

A physical rail connection between the Red and Blue Lines existed in the early part of the 20th century. Railcars from what is today the Blue Line could emerge from a ramp portal surfacing between Joy Street and Russell Street, just beyond Bowdoin station. The railcars would run on former streetcar track down Cambridge Street and then most of the distance to the western end of the Longfellow Bridge, connecting to what is now the Red Line just east of its Cambridge subway portal, near what is now Kendall/MIT station. Because the tracks were unpowered, individual cars had to be towed along the street at night. This connection was never used in passenger service, but was used to transport Blue Line cars to the Eliot Street Yard maintenance shops then located near Harvard Square station. When the Blue Line eventually got its own maintenance shops, the connection was removed and the ramp portal was permanently covered in 1952. A physical connection between the two lines would not be possible in the present day, due to the differing dimensions of the two lines' fleets.

North–South Rail Link

The North–South Rail Link is a proposed MBTA Commuter Rail and Amtrak tunnel which would link North and South Stations, which are currently stub-end terminals. In one of several options, the new tunnel would serve three new stations, two underground near the existing terminals and a third connecting to the Blue Line's existing Aquarium station. Should this link become a reality, it would be possible to transfer from most commuter rail lines to the Blue Line. From Aquarium station, a Blue Line rider could travel north to Airport station within five minutes.

Station listing

Rolling stock

Current

Like the Orange Line and Red Line, the Blue Line tracks are standard-gauge heavy rail. The Blue Line fleet consists of 94 700-series cars with stainless steel bodies from Siemens, with each car long and wide, with two pairs of doors per side. Uniquely among MBTA rolling stock, Blue Line cars use both third rail power and pantograph current pickup from overhead catenary wires. The overhead pantograph was implemented to avoid third rail icing that frequently occurs in winter. Third rail power is used in the original Blue Line tunnels, which are smaller than most modern subway tunnels. Trains switch between the two modes at Airport station, near where the line transitions between running in a tunnel and running above ground. Previously, the switchover was made underground at Maverick station.
The MBTA awarded the $174 million construction contract for the 94 cars in November 2001, with a total program cost of $200 million. The first deliveries were scheduled for January 2004, but ultimately delayed to 2007 due to manufacturing issues. The first set entered revenue service on February 20, 2008. The first three six-car trains began operating on September 15, 2008; by February 2009, eight of thirteen trainsets used at rush hour were six-car sets. By November 2009, all service was with six-car trains.

Former

The first generation of high-floor rolling stock on the line were the No. 1 and No. 2 East Boston Rapid Transit cars, which were built by Pullman-Standard in 1923–1924 when the line was converted from streetcar operation to rapid transit. These were supplemented by the No. 3 fleet, built in 1951 by St. Louis Car Company, which was acquired for the Revere Extension. Cars in these earlier fleets were numbered in the 0500 series.
The Nos. 1–3 fleets were replaced by 70 cars in the 0600 series, built 1978-1980 by Hawker Siddeley Canada Car and Foundry of Thunder Bay, Ontario, Canada. They were long and wide, with two pairs of doors on each side. The design was based on the PA3 model used by PATH in New Jersey. They were narrower and shorter than otherwise similar ones running on the Orange Line, due to the stations and tunnels on the Blue Line having been originally designed to accommodate streetcars. In late 2009, the Seashore Trolley Museum received retired Hawker set 622-623 for their collection. By 2011, most of the 600-series cars were retired because of severe corrosion from the salty ocean air. Several 600-series cars were retained on MBTA property but no longer usable. Parts of scrapped cars are used to maintain Orange Line 1200 series rolling stock, which were built at the same time by Hawker Siddeley and used many of the same components. In 2012, set 616-617 was placed in the former Broadway streetcar tunnel for use in emergency training.