Belo Horizonte Metro


Belo Horizonte Metro is a rapid transit system serving the city of Belo Horizonte, in the state of Minas Gerais in Brazil. The system has one line which serves 19 stations. The Metro carried 58.4 million passengers in 2018, or approximately 160,000 passengers per day. The system is operated by Companhia Brasileira de Trens Urbanos. Two more lines are planned.

History

The first section of the metro opened on 1 August 1986. At its opening, the Metro was long and had six stations with three trains in operation. In 1987 the line was extended to Central station and two more trains were brought into use. The line was extended again several times in the mid-1990s, and finally once more in 2002 adding the last 5 of the current 19 stations.
Further trains were delivered in the 1990s, with the last being delivered in December 2001, bringing the total number of trains to 25.

Operations

Network

LineTerminalsInaugurationLength StationsLength of trip Operation
1Eldorado ↔ Vilarinho1 August 198628.11944 minutesDaily, from 05:45 to 23:00

System characteristics

The trains are supplied by 3000 V DC overhead wires, and have a commercial speed of 40 km/h with a maximum speed of 80 km/h. Track gauge is .

Future service

The transfer of the administration of Belo Horizonte Metro from Companhia Brasileira de Trens Urbanos to MetroMinas is yet to be discussed.
In early 2014, it was announced that the Belo Horizonte Metro will be expanded with two new lines by 2018, with new train cars, and two additional stations added to Line 1.
In September 2015, ten new train cars was introduced officially.
As of February 2016, the construction of Line 2 and 3 is yet to be announced.

Planned lines