Operations began in 2012, using 71.48 km. of the former track of the Ferrocarril Tijuana y Tecate, which was constructed in 1910 by the San Diego & Arizona Railway from San Diego to El Centro. The BJRR is the technical operating and maintenance assistant of the rail line's Baja California segment under agreement from the railroad's operator, ADMICARGA. In February 2013, the local Baja California directors of BJRR announced an investment of $20 million to upgrade the neglected track. The first area to be developed was the first 20 kilometers from the border in Tijuana to El Florido as far as Matanuco. Work started in May 2013 with the building of the Tijuana railroad yard; the focus was on more track capacity, in conjunction with the upcoming San Ysidro Freight Rail Yard Improvement Project by SANDAG. In June 2016, Baja California Railroad secured a 99-year lease with the San Diego Metropolitan Transit System to rehabilitate and operate an additional 112.75 km of track in the United States between Campo, California and Plaster City, California. The line, with 57 bridges and 17 tunnels, will be rehabilitated in three phases: Phase 1, Campo to Jacumba Hot Springs, California; phase 2, Dos Cabezas to Plaster City; and phase 3, from Jacumba to Dos Cabezas. Each year the railroad pays SDMTS a million a year to retain its lease.
Route and stations
Tijuana Station
Tijuana Station is south of the US San Ysidro Port of Entry. The station is now in a three-story building that contains new administrative offices, an operations and logistics control center, offices for ADMICARGA, customs control, a customs agency, the Mexican Secretariat of Agriculture and Rural Development, and the State Committee of Vegetable Sanitation. There is also space for 68 cars. The original railway station, built in the late 1920s, will become a railway museum.
García Station
García Station is farther east, near La Mesa of Tijuana municipality. It has a two-story building with a reception area and offices for customer service, administration, and logistics. Also, after renovations, the storage capacity was increased to, of which is for cold storage:
3 refrigerated chambers with a capacity
1 cold chamber with a capacity
refrigerated unloading area
2 doors from cars directly to an unloading platform