Aphrodite 2


APHRODITE-2 is a submarine telecommunications cable system in the Mediterranean Sea linking Greece and Cyprus.
It has landing points in:
It has a design transmission capacity of 2 x 565 Mbit/s and a total cable length of 868 km. It started operation on 30 September 1994.