The Airedale line is one of the rail services in the West Yorkshire Metro area centred on West Yorkshire in northern England. The service is operated by Northern, on the route connecting Leeds and Bradford with Skipton. Some services along the line continue to Morecambe or Carlisle. The route covered by the service was historically part of the Midland Railway.
According to SELRAP, the Airedale line is the most heavily used passenger route outside the South East of England.

The route and its history

The first section, between Leeds and Bradford, was opened by the Leeds and Bradford Railway on 1 July 1846. A number of the intermediate stations were closed in March 1965, however the line and its major stations remained open. Some of the closed stations, such as, were re-opened during the 1980s.
In 1994 under Regional Railways, the line was electrified at 25 kV AC overhead between Leeds and Skipton, and new British Rail Class 333 trains were introduced in the early 2000s. Investment in the line has seen passenger numbers grow, and now overcrowding on trains is a problem. New stock and longer trains are to be introduced by the new Northern Rail franchisee Arriva Rail North by December 2018 to tackle this issue.
The route is described below. The line originally included a number of stations which are now closed:
Trains of the Leeds–Morecambe line and Settle–Carlisle line also run along the Airedale line from Leeds.

The line today

The line is operated by Northern. The fare structure is as follows :
Recent Network Rail reports have looked at ways of increasing capacity on the line. Because of the difficulty of lengthening platforms at Shipley, it will be hard to introduce longer trains as is being proposed on the neighbouring Wharfedale line. It is therefore proposed to run more trains per hour between Leeds and Keighley, with a new platform at Keighley to accommodate this. New stations were opened at Apperley Bridge in December 2015 and Kirkstall Forge in June 2016
London North Eastern Railway currently operate a small number of daily services on the line, between Skipton/Bradford and London King's Cross. These are operated by InterCity 225's. East Coast, Virgin Trains East Coast's predecessor, wanted to run more frequent services from December 2009 but to do so the line would need more capacity.
A recent report by Modern Railways claimed that a solid hourly service would operate on the line as far as Long Preston, but would serve Carlisle and Lancaster alternately. It may also become a freight artery to improve capacity on the West Coast Main Line. Network Rail's own latest plans involve new signalling and other improvements for the sections of the line beyond Skipton. Carlisle services will be increased to a basic two-hour pattern with extra services to 'fill in the gaps' at peak times during the day to give a 1 train/h frequency. Lancaster services will also be made more frequent, however it has been suggested they will be terminated at Skipton in future, rather than continuing through to Leeds as at present. All of these plans are still dependent on getting enough government funding.