Of the two line rail lines, the east-west line extends, stretching from Ayat Village to Torhailoch, and passing through Megenagna, Meskel Square, Legehar and Mexico Square. The north-south line, which is in length, passes through Menelik II Square, Merkato, Lideta, Legehar, Meskel Square, Gotera and Kaliti. However, two lines have a common track of about 2.7 km. The common track is the elevated section which runs east to west across the southern edge of the CBD from Meskel Square to Mexico Square, and onwards to Lideta. Trains on the north south line are blue and white, whilst on the east west line they are green and white. The Fares cost 2-6 Ethiopian birr. Tickets are bought at orange coloured kiosks next to each station. The final cost to build the railway was US$475m, with construction taking three years. The Addis Ababa Light Rail was originally to have a total of 41 stations on its two lines, and each train was planned have a capacity to carry 286 passengers. This will enable the light rail transit to provide a transportation service to 15,000 passengers per hour per direction and 60,000 in all four directions. The railway lines have their own dedicated power grid. According to CREC the system carried on average 113,500 daily passengers in January 2016 with 153,000 passengers as highest passenger load during a single day. Service frequency was 10 minutes during peak hours on both lines and 20 minutes during off-peak hours. On average there were 94 train rotations on the Blue line and 93 rotations on the Green line.
Future expansion
There are future plans for extensions in all four directions. According to Getachew Betru, CEO of Ethiopian Railways Corporation, the Ethiopian government indicated that any new line built should be completely grade-separated. Apart from extending the existing lines, two new lines are under consideration by the Ethiopian government. The first one will start at St. George's Cathedral, pass along Mexico Square to the African Union Headquarters and will terminate at Lebu, connecting to the new national rail network. The second line will start at Megenagna Roundabout and passes via Bole Airport, Wello Sefer area, Saris market area and Jommo area and terminates at Lebu.
Rolling stock
Addis Ababa Light Rail operates currently a fleet of 41 three-section 70% low-floor trams manufactured by CNR Changchun.
Lines
Blue Line
Open 20 September 2015.
The Blue Line runs south from Menelik Square to Kaliti with 22 stops. There are three planned stops.
Common section
Open 20 September 2015.
The common section runs from St. Lideta to Meskel Square, with 5 stops.